FY2022 Adopted Operating and Capital Budget
FY2022 Adopted Budget Organizational Budgets
Public Works Division
County Strategic Goal Alignment: Prioritize Critical Infrastructure
Good Governance
Provide effective preventive maintenance for installed equipment in all buildings and respond to work orders from building managers for plumbing, electrical, HVAC, carpentry, and painting requests.
FY 2019 FY 2020 FY 2021 FY 2022
Preventative maintenance/inspections completed Construction Crew-Mechanical Equipment replaced/new install (units) Construction Crew-Carpentry Building Space Renovated (Sq.Ft.) Completion for Building Automation system installs/upgrades
Target Actual Target Actual Target Actual Target Actual
6 6
6 6
7
--
--
480 480
480 460
480 600
480
--
--
100
--
--
90
--
--
10,000
--
--
10,250
--
Using a team approach, target critical infrastructure and systems to maintain the health of buildings, utilities, and technology, while minimizing total systemic costs. Reevaluate, identify, and fund in-house systemic needs at required levels. Examine systemic needs, priorities, and funding with a holistic lens focused on sustainability. Evaluate emerging technologies on a continuing basis, with pilot projects and studies implemented when metrics are promising. Preventive maintenance/inspections completed on time: HVAC ± inspection, filter changes, coil cleaning testing, ice machine cleaning Electrical ± electrical panel IR study
Plumbing ± backflow preventers, faucets, toilets, flushing water heaters, change UV lights and water filters, cleaning water fountains and changing filters, checking water pressure and pumps Emergency systems ± emergency lights test, exit signs, fire alarm, sprinkler system Carpentry ± elevators, door hardware ADA closures, roofs