FY2026-FY2031 Proposed Capital Improvement Program

FY2026-FY2031 Proposed Capital Improvement Program

Expanded Animal Control Center

New and Renovated Fire Stations

New & Renovated Senior Centers

New Elementary School #41 Opening August 2026

Frederick County, Maryland Fiscal 2026 Proposed Capital Improvement Program

CONTENTS

PAGE

CAPITAL IMPROVEMENT PROGRAM ....C...I.P....C..a..l.e..n..d..a..r................................................................................................................................................................................... 1 ....I..n..t.r.o..d..u..c..t.i.o..n...................................................................................................................................................................................... 5 ....C...I.P....S..u..m...m...a..r.y................................................................................................................................................................................... 8 ....S...u..m...m...a..r.y...o..f..C...h..a..n..g..e.s....................................................................................................................................................................... 10 ....G...e..n..e..r.a..l..G...o..v..e..r.n..m...e..n..t....................................................................................................................................................................... 16 ....P...a.r..k..s..&....R...e..c..r.e..a.t..i.o..n.......................................................................................................................................................................... 76 ....W....a..t.e..r.s..h..e..d...R..e..s..t.o..r.a..t.i.o..n..................................................................................................................................................................... 94 ....R...o..a..d..s............................................................................................................................................................................................... 102 ....B...r.i.d..g..e..s............................................................................................................................................................................................. 118 ....H...i.g..h..w...a..y..s......................................................................................................................................................................................... 136 ....W....a..t.e..r..a..n..d...S..e..w...e..r............................................................................................................................................................................. 148 ....S...o..l.i.d...W....a.s..t.e...................................................................................................................................................................................... 194 ....F...r.e..d..e.r..i.c..k...C..o..m...m....u..n..i.t.y...C..o..l.l..e.g..e......................................................................................................................................................... 202 ....B...o..a..r.d...o..f...E..d..u..c..a..t.i.o..n.......................................................................................................................................................................... 212 ....M....u..n..i.c..i.p..a..l.i.t.i.e..s.................................................................................................................................................................................. 232

This Page Not Used

INTRODUCTION

This Page Not Used

FY2026 Proposed Budget Capital Improvement Program Budget Calendar

With input from the Capital Improvement Program Committee, Chief Administrative Officer, the Budget Director and Budget staff, and after meetings with County Divisions, the Board of Education (BOE), Frederick Community College (FCC) and Frederick County Public Libraries (FCPL), the County Executive proposes a capital improvement program budget to the County Council no later than April 15 th . The County Council shall then adopt the budget no later than May 31 st .

SEPTEMBER 2024

x Budget instructions for the Capital Improvement Program (CIP) are released to County Divisions, agencies and related organizations

OCTOBER 2024

x CIP base requests are due to the Budget Office

NOVEMBER 2024

x CIP appeal requests are due to the Budget Office

DECEMBER 2024

x County Executive conducts a public hearing to receive proposals to be included in the proposed budget

x CIP Committee meets with requesting organizations to discuss requests and develops a recommended CIP plan

JANUARY 2025

FEBRUARY 2025

x The County Executive and Budget Office staff begin meeting to review CIP budget projections and overview of requests

FEBRUARY/ MARCH 2025

x The County Executive and Budget Director meet with requesting organizations to review CIP budget requests

x Public outreach on budget priorities (for FY26 used Balancing Act tool) x The County Executive releases a draft budget and holds a public hearing to receive public comments on the budget requests x By April 15 th , the County Executive is required to submit a Proposed Budget to the Council, along with a budget message, supporting tables and a financial plan that explains the Proposed Capital Budget and the Capital Improvement Program

MARCH 2025

APRIL 2025

x The County Council holds at least one public hearing on the budget x The County Council holds budget workshops with County staff and independent agencies

APRIL/MAY 2025

x By May 31 st the County Council shall adopt the budget. If the Council does not vote to adopt the budget, the budget as proposed by the County Executive becomes law

MAY 2025

1

This Page Not Used

2

CAPITAL IMPROVEMENT PROGRAM (CIP) FY2026-2031

This Page Not Used

FY2026 Proposed Budget Capital Improvement Program

Introduction

The approved six year Capital Improvement Program (CIP) for fiscal years 2026 – 2031 is hereby presented. The CIP budget was proposed on April 15, 2025. Criteria Projects that meet the definition of a capital improvement are included in the CIP. Capital improvements are defined as: - will add to the government’s public infrastructure OR - will result in a major repair of a fixed asset that significantly adds to or preserves the life of the original asset OR - will establish or enhance internal computer/program systems. This excludes routine expenses such as maintenance, license renewals, etc. The project will also have an individual project cost totaling $100,000 or more. Projects of less than $100,000 will only be permitted when required for State or Federal funding; and multiple projects in a single category, totaling $100,000 or more, will also be considered if they meet all other characteristics. Acquisition of land for future projects (land banking) will be eligible when it has been identified as a need in the six-year CIP, in the County Comprehensive Plan, or when it can be shown as necessary and based on recent growth trends. Municipal projects will be considered if the project is not exclusively for municipal residents or if the project is a cooperative effort by municipal, county and/or state agencies. Operating costs that are associated with the capital projects are located in the Capital Budget Fund section of the Operating Budget. These costs will impact the Operating Budget once a project has been completed.

Proposed CIP was able to identify full or partial funding for 176 projects that totaled $1,717,168,530.

Category

Proposed

General Government Parks & Recreation

$

417,634,916 50,426,506 49,130,900 53,102,000 24,511,800 105,201,000 266,296,827 16,310,720 97,960,183 635,318,678

Watershed Restoration & Retrofit

In Millions of dollars

Roads Bridges

350.8 305.2

$0 $100 $200 $300 $400

Highways

299.5

280.3

259.4

Water and Sewer

222.0

Solid Waste

Community College Board of Education

Municipalities

1,275,000

TOTAL

$

1,717,168,530

FY2026 FY2027 FY2028 FY2029 FY2030 FY2031

5

FY2026 Proposed Budget Capital Improvement Program

Introduction

REVENUE SOURCES Funding for the Capital Improvement Program comes from many sources, primarily pay-go (general fund, recordation tax, and impact fee), bonds (general fund, recordation tax, and impact fee), enterprise user fees, state & federal grants and developer participation. Revenue sources are increasing, however balancing requests with available cash and “affordable” debt will continue to impact the CIP.

Proposed

General Fund

360,667,979 577,843,058 23,320,344 10,006,670 17,750,000 13,000,000 8,395,185 8,000,000 50,884,680 25,768,322 56,513,904 64,474,493 139,202,101 28,034,705 160,773,461 172,533,628

General Fund Bonds/Lease Recordation Taxes - Parks Recordation Tax Bonds - Parks Recordation Taxes - Schools Recordation Tax Bonds - Schools

Impact Fees - Library

Impact Fees Bonds -Library Impact Fees -Schools Mitigation Fees Schools Enterprise Fund Pay go Enterprise Fund Bonds

Grants - State Grants - Federal

Cash - Forward Fund State

Other

TOTAL

1,717,168,530

REVENUE SOURCES

l d

6

FY2026 Proposed Budget Capital Improvement Program

Introduction

REVENUE SOURCES A special revenue source was established in 2025 with an additional $.05 added to the property tax rate. This funding is for the Dedicated Reserve for Future Years for School Construction which will be applied toward school construction projects that will not increase new student capacity. Funding is budgeted to be utilized in the FY2026-FY2028 CIP budgets.

Dedicated Reserve for Future Years School Construction

Estimated Revenue Funds Utilized Balance

FY2025Adopted Budget FY2026 Proposed Budget

21,346,438

21,346,438 23,247,569

FY2026 Middletown Co Located ES/MS

11,263,053 2,579,282 20,752,658 5,000,000 14,950,942 14,191,500

FY2026 Brunswick High School

FY2026 Twin Ridge ES Limited Renovations FY2026 Hillcrest ES Limited Renovations

4,999,014

FY2027 Proposed Budget

24,701,207

FY2027 Brunswick High School

FY2027 Hillcrest ES Limited Renvoation

557,779

26,010,371

FY2028 Proposed Budget

FY2028 Brunswick High School

26,549,513

18,637

FY2029 Proposed Budget FY2030 Proposed Budget FY2031 Proposed Budget

27,407,558 56,248,092 86,617,174

27,388,921 28,840,534 30,369,082

7

FY2026 - 2031 Proposed Capital Improvement Program Summary - All Projects

Asset Category General Government Parks & Recreation

6-year **

Total Project 660,160,757 123,424,764 106,766,017 101,443,433 30,562,288 133,241,218 653,238,564 21,578,120 184,688,811 832,380,051 2,492,590

Prior

2026

2027

417,634,916 50,426,506 49,130,900 53,102,000 24,511,800 105,201,000 266,296,827 16,310,720 97,960,183 635,318,678 1,275,000

153,619,554 23,783,358 57,635,117 12,332,233 4,972,688 27,836,218 198,006,237 5,267,400 16,946,628 125,234,012 1,217,590 626,851,035 127,395,304 180,375,993 8,390,528 10,109,367 3,000,000 45,639,355 57,667,330 194,273,158 626,851,035

89,254,067 8,398,806 8,603,000 5,468,100 6,822,000 7,200,000 51,189,022 4,518,720 10,318,550 158,765,666

50,668,766 16,553,750 8,901,600 5,889,700 4,473,700 11,334,300 83,702,340 9,344,000 25,809,038 88,292,149 200,000 305,169,343 59,330,612 76,112,676 14,708,471 1,445,185 58,414,508 32,594,028 62,563,863 305,169,343 0

Watershed Restoration & Retrofit

Roads Bridges Highways

Water & Sewer Solid Waste

Community College Board of Education Municipalities

250,000

Total Expense

1,717,168,530 2,849,976,613

350,787,931

Funding General Fund

360,667,979 577,843,058 64,077,014 67,279,865 25,768,322 120,988,397 167,236,806 333,307,089

502,962,506 932,176,370 121,264,242 77,389,232 28,768,322 323,444,217 267,479,850 596,491,874

64,053,224 98,199,048 20,567,826 19,203,185 18,768,322 30,566,812 24,595,995 74,833,519 350,787,931

General Fund Bonds & Capital Leases

Recordation Tax & Bonds Impact Fees & Bonds School Mitigation Fee Enterprise Fees & Bonds

Grants Other

Total Funding Sources

1,717,168,530 2,849,976,613

** The 6-year is the sum of FY 2026 through FY 2031.

8

FY2026 - 2031 Proposed Capital Improvement Program Summary - All Projects - Continued

Asset Category General Government Parks & Recreation

2028

2029

2030

2031

Costs After 88,906,287 49,214,900 36,009,200 1,077,800 204,000 188,935,500 69,782,000 71,827,361 0 0

78,976,439 11,597,050 8,166,000 6,982,500 2,576,500 25,033,000 40,162,040 2,448,000 13,660,153 90,460,858 275,000 280,337,540 58,670,678 97,315,580 10,012,479 4,500,000 17,619,110 30,406,706 61,812,987 280,337,540 0

47,931,693 3,991,750 6,998,300 11,026,100 5,867,000 17,753,000 29,421,140 16,403,862 82,320,911 250,000 221,963,756 0 54,674,823 89,716,962 6,289,238 7,359,873 4,430,210 31,090,441 28,402,209 221,963,756 0

75,082,282 6,864,150 8,262,000 13,221,600 1,453,600 17,547,800 34,848,645 24,412,783 117,598,129 0

75,721,669 3,021,000 8,200,000 10,514,000 3,319,000 26,332,900 26,973,640 7,355,797 97,880,965 100,000 259,418,971 59,850,193 95,368,121 4,300,000 18,740,509 4,000,000 1,982,710 23,354,925 51,822,513 259,418,971 0

Watershed Restoration & Retrofit

Roads Bridges Highways

Water & Sewer Solid Waste

Community College Board of Education Municipalities

200,000

0

Total Expense

299,490,989

505,957,048

Funding General Fund

64,088,449 121,130,671 8,199,000 16,031,113 3,000,000 7,975,047 25,194,711 53,871,998 299,490,989

14,899,223 173,957,319 48,796,700

General Fund Bonds & Capital Leases

Recordation Tax & Bonds Impact Fees & Bonds School Mitigation Fee Enterprise Fees & Bonds

0 0

156,816,465 42,575,714 68,911,627 505,957,048

Grants Other

Total Funding Sources

9

FY2026 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

Proposed Construction Year

PUBLIC SAFETY (General Government) Project Name

Project #

Notes

GG1011 *PSTF Master Plan GG1031 Carroll Manor Fire Station

2027 2026

New Project No Change

2026

GG1036 Renovation of Westview Fire Station #31

2025/26

2025/26 Additional funding added to project

GG1035 Jefferson Tech Fire Station

Design 2029 Study 2029

Design 2030 Delayed 1 year Study 2029 No Change

GG1036 Renovation of Spring Ridge Fire Station

GG1037 Tilco Unit A Renovation GG1080 SCBA Replacement GG1086 Fire Alerting System

2025/26 2024-26 2025/26 2028/31

2025/26 Additional funding added to project 2024-26 Additional funding added to project 2025/26 Additional funding added to project

GG1089 Emergency Generator Replacement (DFRS) GG1090 Fire Service Water Supply Locations GG1095 PSTF Driving/Multi Purpose Training Course GG1098 Fire Apparatus and Vehicle Replacement GG1092 Hazmat Team Meters

2028/31 No Change

2027,2029,2031 2027,2029,2031 Reduced funding per year

2026,2028-31

2026,2028-31 No Change

2028

2028

No Change

On-going

On-going No Change

GG1109 ADC Courtyard Offices

2026

2026

No Change No Change No Change No Change No Change

GG1156 Sheriff Office Mobile Data Terminal Replacements

2025-2027, 2030 2031

2025-2027, 2030 2031

GG1160 Sheriff's Department District Office GG1162 Law Enforcement Center Renovation GG1164 Sheriff's office Dell Isilon upgrade GG1198 Portable Radio Replacement GG1200 Public Safety communications site systemics GG1201 County Radio System Upgrade to MPLS GG1203 *Gambrill Tower Shelter Replacement GG1204 *ADC Body Scanner Equipment GG1202 Radio System Improvements

2029 2029 2030

2029 2029 2030

2029-30

2029-30 No Change 2026-2031 No Change

2026-2031

2028 2026

2028 2026 2026 2029 2027

Additional funding added to project

No Change New Project New Project New Project

GG1205 *PSTF Consoles

Current Construction Year

Proposed Construction Year

MISCELLANEOUS BUILDINGS AND SYSTEMICS (General Government) Project Name

Project #

Notes

2030-2032

2030-2033 Delayed 1 year

GG2019 Courthouse Capacity Improvements Project GG2030 Public Safety Training Facility Maintenance Shop and Garages GG2038 Montevue Campus Renovations/Reconfiguration GG2045 Prospect Center Building Acq & Build Out

2029 2029

2030 2030

Delayed 1 year Delayed 1 year

2022-2028

2022-2028 Additional funding to project

GG2046 East County Senior Center GG2047 General Acquisition Account GG2049 CCRC Montevue Renovation GG2050 Taney Ave Senior Center Renovation GG2051 Brunswick Senior Center GG2053 Extension Service Building Renovation GG2054 Montevue Warehouse Complex GG2070 *DPW Operations Master Plan GG4199 Maintenance Systemics - General GG6003 CEAP Energy & Resiliency GG2052 Montevue Senior Living

2028

2030

Delayed 2 years

2025-2029 2024/25

2026-2031 Additional funding added to project 2024-2026 Additional funding added to project

2030 2032 2031 2033

2031 2028 2031

Delayed 1 year

Moved forward 4 years

No Change

2033;Study 2030 No Change

2032: Design 2031

2032: Design 2031

No Change

2026: Study New Project

On-going 2024/25

On-going

2024-2026 Additional funding added to project 2026-2031 Funding spread to all 6 years

GG6005 EV Infrastructure GG6006 CEAP Planning

2027,2029,2031

2026,2028,2030 2026,2028,2030 No Change

GG6007 *Construction Building Energy Performance

2026-2031 New Project 2027: Study New Project

GG1206 *Space Modernization

GREEN Additional funding added or New Project RED Project delayed

* Denotes "New" project

10

FY2026 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

Proposed Construction Year

Project #

LIBRARY (General Government) Project Name

Notes

GG3006 Linganore Town Center Library GG3007 Westside Library GG3008 North Frederick Library GG3009 C Burr Artz Library Renovation

2029 2026 2031 2033

2029 2026 2031 2033

No Change No Change No Change No Change

Current Construction Year

Proposed Construction Year

Project #

TECHNOLOGY (General Government) Project Name

Notes

GG5001 IIT Systemics- General GG5006 Enterprise GIS GG5008 Financial System GG5009 Land Management

On-going On-going On-going On-going On-going On-going On-going

On-going No Change On-going No Change On-going No Change On-going No Change On-going No Change

GG5016 Enterprise Asset Management Software GG5017 Public Safety Tech Integration & Modernization GG5080 Video Services On-going Replacement/Upgrade

On-going No Change; replaces LEAPS project

On-going No Change

Current Construction Year

Proposed Construction Year

Project #

PARKS AND RECREATION Project Name

Notes

PR0001 Acquisition

On-going

Defund

No further funding FY2026-2031

PR1023 Othello RP Phase 2

2027 2026 2032 2031

2027 2027 2033 2034

No Change

PR1036 Richard W. Kanode Farm Park PR1037 North County Regional Park PR1039 Calico Rocks Regional Park-Phase I

Delayed 1 year Delayed 1 year Delayed 3 years

PR1040 Green Hill Park-Phase 2 PR1041 Centerville Community Park

Design 2030;2032 Design 2030;2032 No Change

Study 2030 On-going

Study 2033 Delayed 3 years On-going No Change

PR2000 Parks Systemic

PR2009 Ballenger Creek Park Maintenance Area & Widrick House Rehabilitation PR2010 Playground Replacement and Reconstruction PR2013 Ballenger Creek Park Synthetic Turf Field Carpet Replacement PR2019 *Athletic Field and Court Lighting Replacement PR2012 River Access Master Plan

2027

2028

Delayed 1 year

2028,2030

2028,2030 No Change

Master Plan; 2030 Master Plan: 2032 Delayed 2 years

2030

2028

Moved forward 2 years

2028,2030 New Project

PR3001 Bikeways/Trails Program

Various

Various

No Change

Current Construction Year

Proposed Construction Year

Project #

WATERSHED RESTORATION Project Name

Notes

WR1026 County-Owned Stormwater Facility Retrofits

On-going On-going On-going On-going On-going

On-going No Change On-going No Change On-going No Change On-going No Change On-going No Change

WR1039 Reforestation Program WR1042 Stream Restorations

WR1044 Non-County Owned Stormwater Facility Retrofits

WR1099 Watershed Systemics

GREEN Additional funding added or New Project RED Project delayed

* Denotes "New" project

11

FY2026 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

Proposed Construction Year

Project #

ROADS Project Name

Notes

RD1061 Reichs Ford Road - Ph 2 RD1064 Yeagertown Road

2030 2029 2027 2026 2026

2030,2031 Split funding

2029

No Change

RD1069 Monrovia East West Connector RD1070 Braddock Heights Improvements RD1072 Artie Kemp Road RD1073 Michaels Mill Road RD1074 Old National Pike Corridor

2025/26

2025/26 Additional funding added to project

2028 2026 2026

Delayed 1 year No Change

No Change No Change

Study: 2029; Design 2030 Study: 2030 Design: 2032 Study: 2031 Design: 2033

Study: 2029; Design 2030 Study: 2030 Design: 2032 Study: 2031 Design: 2033

RD1075 Ballenger Creek Pike Corridor

No Change

RD1076 New Design Road Corridor

No Change

RD1077 Improvements to Urbana Pike RD1078 Bethel Road Improvements RD1080 Elmer Derr Road Realignment

Study: 2027: 2030 Study: 2027: 2030 No change Study: 2028:2030 Study: 2028:2030 No change

Study: 2029 Design: 2031

Study: 2030 Design: 2032

Delayed 1 year

Study: 2029:2032 Study: 2029:2032 No Change

RD1081 Yellow Springs Road Improvements

Current Construction Year

Proposed Construction Year

Project #

BRIDGES Project Name

Notes

BR1037 Hornets Nest Road Bridge BR1038 Biggs Ford Road Bridge F26-04 BR1052 Sixes Bridge Road Bridge BR1053 Oppossumtown Pike Bridge BR1054 Lynn Burke Road Bridge Replacement BR1058 Dollyhyde Road Bridge BR1059 Bridge at Prices Distillery Road BR1060 Bullfrog Road Bridge F05-06 BR1061 Loys Station Covered Bridge F04-02 BR1063 Bennies Hill Road Bridge Replacement BR1064 Roy Shafer Road Abutment Replacement BR1056 Holter Road Bridge BR1057 Hessong Bridge Road Bridge (F20-21) BR1062 Park Mills Road Culvert

2024 2025 2026 2027 2028 2027 2030 2030 2030 2031 2031 2028 2031 2031

2024,2026 Additional funding added to project 2025/26 Additional funding added to project

2026 2027 2028 2027 2029 2031 2030 2032 2031 2029 2031 2031

No Change No Change No Change No Change

Move forward 1 year

Delayed 1 year No Change Delayed 1 year

No Change

Delayed 1 year

No Change No Change

Current Construction Year

Proposed Construction Year

Project #

HIGHWAYS Project Name

Notes

Reduced FY26 funding: Adjusted funding between fiscal years

HW1001 Pavement Management Program

On-Going On-Going 2025/26 On-Going 2022/25/26 2026

On-Going

HW1050 Highway Network Systemic - General HW1090 Sidewalk Retrofit Program HW1095 Pedestrain and Bicycle Missing Links HW1101 Traffic Control and Safety HW1201 Cloverhill Stormdrain Improvements HW1202 Drainage Assessment Response Team (DART) HW3002 Thurmont & Johnsville Satellite Facility Improvements

On-Going Reduced funding for various years

2025/26 No Change

2027,2029,2031 Additional funding for other years On-Going Additional funding added to project 2022/25/26/28 Additional funding for other years

Various

Various

No Change

2027 2031

2028 2031

Delayed 1 year

No Change

HW3006 Frederick Satellite Yard

GREEN Additional funding added or New Project RED Project delayed

* Denotes "New" project

12

FY2026 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

Proposed Construction Year

Project #

WATER/SEWER Project Name

Notes

WS1001 Ballenger-McKinney WWTP Sludge Management WS1002 Sewerage Problem Area Remediation

2028 2030 2024 2022 2030 2030

2028 2030

No Change No Change

WS1009 Inflow & Infiltration, 1-201A-S

2024,2026,2028, 2030

Added funding in other years

WS1010 Inflow & Infiltration, Ph 2 201B-S WS1012 Linganore Interceptor 1-Lower Reach WS1013 Linganore Interceptor 2-Upper Reach WS1017 Water Storage Tank Improvements WS1028 Developer Funded Infrastructure WS1047 Maintenance Building Expansion WS1053 Inflo/Infiltr Study Ph 3 201C-S WS1066 Water Distribution Improvements

2026,2028,2030 Added funding in other years

2030 2030

No Change No Change

2023-2026 On-Going 2025-2027

2023-2026 No Change

On-Going Additional funding added to project

2025-2027 No Change

2024 2026

2024/2026 Additional funding added to project

2026

No Change

WS1084 Water Meter Relocations

2025-2027 2024-2028 2024-2026

2025-2027 No Change 2024-2028 No Change 2024-2026 No Change

WS1087 Refurbish Bolted Steel Water Tanks

WS1088 Buckeystown Interceptor Sewer Rehabilitation WS1089 Ballenger WWTP Electrical Services Improvements

2025

2025/26 Additional funding added to project

WS1091 *SCDA Systems Upgrade WS1092 *Update to GIS System WS1093 *Inactive Properties Study

2026/27 New Project 2026/27 New Project

2026 2026

New Project New Project

WS1094 *New Design WTP Condition Assessment *Water Booster Pump Stations (New Design) Condition Assessment WS1096 *Water Storage Tanks (New Design) Condition Assessment *Water Systems (Non New Design) Condition Assessment WS1098 *Quantum Domestic Water Storage Tank WS1095 WS1097 *New Design Water Distribution System Operational Efficiency Study WS1101 DWSU Maintenance Systemics-Ballenger Wastewater WS1108 DWSU Maintenance Systemics-Water WS1200 *Small Systems Office retrofit WS1201 *Bradford WTP well and PFAS modifications WS1202 *Jefferson Water System Redundancy WS1204 *Influent and efluent sewer meters at all WTPs WS1205 *Ballenger McKinney WWTP Bar Screen WS1206 *Jefferson WWTP Bar Screen Upgrade WS1208 *Sewer Meters for Sewage Pumping Stations WS1209 *Stuart Mechanic SPS Upgrades WS1210 *Fountaindale Waterline replacement WS1211 *Point of Rocks Sewer Line replacement WS1212 *Backflow prevention on Residental water meters WS1099 WS1102 DWSU Maintenance Systemics-Small Systems Wastewater WS1203 *Regional Water Meters WS1207 *Fountaindale WTP Upgrade

2026-2028 New Project

2026-2028 New Project

2026-2027 New Project

2027 2026

New Project New Project

On-Going

On-Going No Change

On-Going On-Going

On-Going No Change On-Going No Change 2027-2028 New Project 2026,2028 New Project

2030 2027 2028 2028 2026 2028 2027 2027

New Project New Project New Project New Project New Project New Project New Project New Project

2027-2030 New Project

2026-2030 New Project

2027-2030 New Project

WS1213 *Crestview White Rock SPS

2028

New Project

GREEN Additional funding added or New Project RED Project delayed

* Denotes "New" project

13

FY2026 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

Proposed Construction Year

Project #

SOLID WASTE Project Name

Notes

SW1007 Leachate Treatment/ Office Facilities Rehabilitation 2024/25

2027/28 Additional funding added to project 2024,2026 Additional funding added to project

SW1010 Transfer Station Project SW1014 *Transfer Station Floor

2024

2026/27 New Project

2027 2026

New Project New Project

SW1015 *Leachate Tank Replacement & Cleaning SW1016 *Expansion of Composting Operations

Current Construction Year 2029-2031

Proposed Construction Year

Project #

COMMUNITY COLLEGE Project Name

Notes

FC1023 Health Education and Athletics Center (Bldg D) FC2009 Campus Services Building (Bldg P) FC2011 Innovation and Technology Center

2031-2033 Delayed 2 years

2024-2026 2024: 2026-2027 No Change

Move forward 3 years and additional funding added to project

2030-2033 On-Going On-Going On-Going

2027-2030

On-Going No Change On-Going No Change

FC5007 Technology Upgrade

FC5008 Classroom Technology Upgrades

FC5012 FCC Systemics

On-Going Additional funding added to project

Current Construction Year

Proposed Construction Year

Project #

BOARD OF EDUCATION Project Name

Notes

Continued funding 2026-2031: Utilized for projects 2026-2028

AP1102 Dedicated Reserve for Future Years for School Construction ED1022 Yellow Springs ES Replacement ED1024 Middletown combined ES/MS replacement building

On-Going

On-Going

2025 2026 2029

2025/26 Additional funding added to project 2026/27 Additional funding added to project

ED1025 Liberty ES Replacement

2030

Delayed 1 year

ED1041 Brunswick High School Replacement

Site/Pre design 2026: 2028/29

Design: 2027; 2029

Moved forward 1 year; additional funding Moved forward 1 year; additional funding

ED1048 New ES #41 ED1051 New ES #42

2027 2030

2026 2031

Delayed 1 year Delayed 1 year

ED1052 Walkersville MS: Modernization Study

Study 2027: 2031/32 2024-2027 On-Going On-Going 2026/27 2026-2028

Study 2029: 2032/33

ED2001 FCPS Bus Facility ED5001 Systemics - Generic

2024-2027 No Change

On-Going Additional funding added to project

On-Going No Change

ED5002 Limited Renovations Systemics ED5905 Twin Ridge ES Limited Renovations ED5906 Hillcrest ES Limited Renovations ED6001 New Buses-Capacity ED7018 Portable Classrooms FY2026

2026 Moved forward 1 year; additional funding 2026/27 Moved forward 1 year; additional funding

2026

2026

Added 3 buses for FY26

On-Going

On-Going Added Additional Funding FY26

Current Construction Year

Proposed Construction Year

Project #

MUNICIPALITIES Project Name

Notes

MP1001 Frederick Municipal Airport

Various

Various

No Change

GREEN Additional funding added or New Project RED Project delayed

* Denotes "New" project

14

CIP – GENERAL GOVERNMENT

FY2026 - 2031 Proposed Capital Improvement Program General Government

Project

6-year

Total Project

Prior

2026

2027

Public Safety

PSTF Master Plan

180,000 11,274,300 2,430,800 3,032,800 1,655,686 150,000 1,020,000 900,000 158,800 1,745,200 16,439,000 1,087,600 7,785,400 1,867,100 375,100 6,120,000 719,400 3,000,000 3,366,000 2,000,000 130,000 2,500,000 96,900 42,350

180,000 12,415,567 4,751,390 13,622,300 12,955,686 1,981,532 2,315,800 1,512,300 592,514 1,745,200 16,439,000 1,989,604 8,785,400 1,867,100 750,200 14,942,500 836,920 4,198,700 3,366,000 2,000,000 130,000 2,500,000 96,900 852,650

0

0

180,000

Carroll Manor Fire Station

1,141,267 2,320,590

11,274,300 2,430,800

0 0 0 0 0 0 0 0

Renovation of Westview Fire Station #31

Jefferson Tech Fire Station

0 0

0 0

Renovation of Spring Ridge Fire Station

Tilco Unit A Renovation SCBA Replacement Fire Station Alerting System

810,300 6,800,000 1,831,532 1,295,800 612,300 223,414

42,350

1,655,686 150,000

Emergency Generator Replacement (DFRS) Fire Service Water Supply locations PSTF Driving / Multi-Purpose Training Course Fire Apparatus and Vehicle Replacement Sheriff Office Mobile Data Terminal Replacements Sheriff's Department District Office Law Enforcement Center Renovation Sheriff's Office Dell Isilon Upgrade Hazmat Team Meters County radio system upgrade to MPLS/microwave upgrade Radio System Improvements Gambrill Tower Shelter Replacement ADC Body Scanner Equipment Portable Radio Replacement Public safety communications site systemics Courthouse Capacity Improvements Project Public Safety Training Facility Maintenance Shop and Garages Montevue Campus Renovation and Reconfiguration Prospect Center Building Acq & Build Out East County Senior Center General Acquisition Account CCRC Montevue Renovation Brunswick Senior Center Montevue Senior Living Taney Ave. Senior Center Renovation Extension Service Building Renovation Montevue Warehouse Complex DPW Operations Master Plan PSTF Consoles ADC Courtyard Offices Space Modernization

0 0

300,000

118,600

0

0

0

213,400

0

2,628,000 271,900

3,926,000 271,900

902,004

1,000,000

0 0 0 0

1,118,100

0

0 0 0

375,100 5,762,500 117,520

119,900

119,900

0

0

0

0 0 0 0

3,366,000 2,000,000

0 0 0

0 0

2,500,000 8,629,300

Total: Public Safety

68,076,436 110,827,263

23,192,327

24,057,536

Other

1,609,300 250,000 54,877,163 6,066,400

1,852,987 250,000 87,359,298 6,066,400

243,687

1,609,300

0

0

0 0 0

250,000

4,825,648

0 0

0

1,011,300

7,224,500

0

0

0

87,317,768 161,512,711

74,194,943 300,000 3,073,500 11,614,344

32,448,884

26,340,284

14,738,400 8,500,000 2,000,000 6,642,900 14,636,450 21,754,400 544,200 117,300 250,000 575,000 2,805,000 750,000 2,400,000

15,038,400 11,573,500 13,614,344 6,642,900 14,836,450 21,754,400 4,692,900 1,965,700 250,000 2,023,435 3,380,000 750,000 3,000,000

0

0

3,250,000 2,000,000

2,250,000

0 0 0 0 0 0 0 0

0

0

200,000

1,326,000

0 0 0 0

0 0 0

250,000 575,000 480,000 250,000 400,000

CEAP-Energy & Resiliency

1,448,435 575,000

EV Infrastructure CEAP Planning

425,000

0 0

0

Construction Building Energy Performance

400,000

Total: Other

226,845,581 363,787,925

96,475,557

42,589,184

29,665,284

16

FY2026 - 2031 Proposed Capital Improvement Program General Government - Continued

Project

2028

2029

2030

2031

Costs After

Public Safety

PSTF Master Plan

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0

Carroll Manor Fire Station

Renovation of Westview Fire Station #31

Jefferson Tech Fire Station

3,032,800

10,589,500

Renovation of Spring Ridge Fire Station

96,900

Tilco Unit A Renovation SCBA Replacement Fire Station Alerting System

4,500,000

Emergency Generator Replacement (DFRS) Fire Service Water Supply locations PSTF Driving / Multi-Purpose Training Course Fire Apparatus and Vehicle Replacement Sheriff Office Mobile Data Terminal Replacements Sheriff's Department District Office Law Enforcement Center Renovation Sheriff's Office Dell Isilon Upgrade Hazmat Team Meters County radio system upgrade to MPLS/microwave upgrade Radio System Improvements Gambrill Tower Shelter Replacement ADC Body Scanner Equipment Portable Radio Replacement Public safety communications site systemics Courthouse Capacity Improvements Project Public Safety Training Facility Maintenance Shop and Garages Montevue Campus Renovation and Reconfiguration Prospect Center Building Acq & Build Out East County Senior Center General Acquisition Account CCRC Montevue Renovation Brunswick Senior Center Montevue Senior Living Taney Ave. Senior Center Renovation Extension Service Building Renovation Montevue Warehouse Complex DPW Operations Master Plan PSTF Consoles ADC Courtyard Offices Space Modernization

510,000

510,000 300,000 14,400

0

300,000

18,600

2,400

4,800

210,300

1,531,800

0

0

0

4,957,000

2,164,000

100,000 271,900

2,664,000 271,900

0

0

0

6,667,300 1,577,300 3,060,000 119,900 0

0 0

0 0 0 0

289,800

0 0

375,100 3,060,000 119,900

3,060,000

119,900 3,000,000

119,900

0

0

0

0

1,198,700

0 0 0 0

0 0

0 0 0 0

0 0 0 0

0 0 0 0

130,000

0

Total: Public Safety

10,427,100

14,117,800

6,964,500

3,880,200

19,558,500

Other

0 0

0 0 0

0 0

0 0

0 0

7,407,700

35,012,976 5,595,200

12,456,487

27,656,487

0

471,200

0

0

0

0

1,011,300

0

6,213,200

28,528,600 1,336,600 2,250,000

0 0

0

0 0

0 0 0 0 0 0 0 0 0 0 0

13,401,800 250,000

250,000

250,000

0 0 0 0 0 0 0

0

0 0 0 0 0 0 0

0

808,000

5,834,900

13,310,450

0

0

1,565,000

20,189,400 452,400 117,300

0 0 0 0

91,800

4,148,700 1,848,400

0 0

CEAP-Energy & Resiliency

EV Infrastructure CEAP Planning

475,000 250,000 400,000

475,000

475,000 250,000 400,000

475,000

0

0

Construction Building Energy Performance

400,000

400,000

600,000

Total: Other

53,958,350

3,969,200

56,488,076

40,175,487

40,466,787

17

FY2026 - 2031 Proposed Capital Improvement Program General Government - Continued

Project

6-year

Total Project

Prior

2026

2027

Library Linganore Town Center Library Westside Library North Frederick Library C Burr Artz Library Remodel

18,535,800 9,123,500 22,157,600 2,205,500 52,022,400

18,535,800 11,875,133 26,712,800 26,531,300 83,655,033

0

0

1,365,700

2,751,633

9,123,500

0

0 0

0 0

299,700

0

Total: Library

2,751,633

9,123,500

1,665,400

Maintenance/Systemic Maintenance Systemics - General

34,320,900 34,320,900

38,693,924 38,693,924

4,373,024 4,373,024

6,320,900 6,320,900

6,000,000 6,000,000

Total: Maintenance/Systemic

Technology IIT Systemics - General FY25-FY27

20,078,309 1,800,000 4,838,940 874,224 1,798,056

26,320,416 4,902,536 11,087,550 3,671,289 7,782,408

6,242,107 3,102,536 6,248,610 2,797,065 5,984,352

3,780,530 300,000 1,467,276 145,704 599,352

3,247,289 300,000 145,704 145,704

Enterprise GIS Financial Systems Land Management

Enterprise Asset Management (EAM)- software Public Safety Tech Integration & Modernization Project (PSTIM)

0

4,608,510

4,608,510

0

768,085

768,085

Video Services On-going Replacement/Upgrade

2,371,560

4,823,903

2,452,343

102,000

102,000

Total: Technology

36,369,599

63,196,612

26,827,013

7,162,947

4,708,782

Total Expense

417,634,916 660,160,757 153,619,554

89,254,067

50,668,766

Funding General Fund

109,894,794 179,189,374 282,840,517 436,053,351

63,880,257 71,220,870 720,000 2,535,718 6,190,270 9,072,439

23,144,470 58,075,527 4,000,000

20,770,055 28,819,456 645,185

General Fund Bonds & Capital Leases

Impact Fees & Bonds Enterprise Fees & Bonds

16,395,185

17,115,185 2,590,138 16,140,270 9,072,439

54,420

9,070

9,070

Grants Other

8,450,000

4,025,000

425,000

0

0

0

Total Funding Sources

417,634,916 660,160,757 153,619,554

89,254,067

50,668,766

18

FY2026 - 2031 Proposed Capital Improvement Program General Government - Continued

Project

2028

2029

2030

2031

Costs After

Library Linganore Town Center Library Westside Library North Frederick Library C Burr Artz Library Remodel

0 0

17,170,100

0 0 0 0 0

0 0

0 0

0

1,798,100

1,988,100

18,071,700 2,205,500 20,277,200

4,555,200 24,325,800 28,881,000

0

0

Total: Library

1,798,100

19,158,200

Maintenance/Systemic Maintenance Systemics - General

6,000,000 6,000,000

6,000,000 6,000,000

5,000,000 5,000,000

5,000,000 5,000,000

0 0

Total: Maintenance/Systemic

Technology IIT Systemics - General FY25-FY27

3,330,912 300,000 1,467,276 145,704 599,352

3,225,000 300,000 145,704 145,704

3,247,289 300,000 1,467,276 145,704 599,352

3,247,289 300,000 145,704 145,704

0 0 0 0 0

Enterprise GIS Financial Systems Land Management

Enterprise Asset Management (EAM)- software Public Safety Tech Integration & Modernization Project (PSTIM)

0

0

768,085

768,085

768,085

768,085

0

Video Services On-going Replacement/Upgrade

181,560

102,000

102,000

1,782,000

0

Total: Technology

6,792,889

4,686,493

6,629,706

6,388,782

0

Total Expense

78,976,439

47,931,693

75,082,282

75,721,669

88,906,287

Funding General Fund

24,401,907 54,565,462

11,200,497 28,722,126 5,500,000

14,520,083 60,553,129

15,857,782 52,104,817 6,250,000

5,414,323 81,991,964

General Fund Bonds & Capital Leases

Impact Fees & Bonds Enterprise Fees & Bonds

0

0

0 0

9,070

9,070

9,070

9,070

Grants Other

0 0

2,500,000

0 0

1,500,000

1,500,000

0

0

0

Total Funding Sources

78,976,439

47,931,693

75,082,282

75,721,669

88,906,287

19

Capital Project Summary

Capital Project Number: GG1011 Capital Project Title: PSTF Master Plan Asset Type: Public Safety Asset Category: General Government

Activity #:

Region: Frederick

Year Identified: 2025 Est Completion Date: 6/30/2027

Capital Project Status: Active

Capital Project Description: A master plan for the Public Safety Training Facility was completed in October 2018 to ensure optimum location for additions to the 117-acre campus. The needs of Fire & Rescue Servies, Public Works, Emergency Management, Frederick County Sheriff, and other County stakeholders were identified. Many changes have occurred throughout various County agencies since the initial master plan was completed. An updated master plan will identify current stakeholders and building constraints delineated prior to future development of the property.

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2026

2027

2028

2029

2030

2031 Costs After

Studies / Surveys Project Management

150,000 30,000 180,000

150,000 30,000 180,000

Total Cost:

Funding Schedule:

Project Total

Prior Budget

Categories

2026

2027

2028

2029

2030

2031 Costs After

Trans from General Fund

180,000 180,000

180,000 180,000

Total Cost:

20

Capital Project Summary

Capital Project Number: GG1031

Activity #: C1052.1052.01

Capital Project Title: Carroll Manor Fire Station

Region: Adamstown

Capital Project Status: In Progress Asset Type: Public Safety Asset Category: General Government

Year Identified: 2019 Est Completion Date: 12/1/2026

Capital Project Description: The new fire/rescue station will be located at Route 85 and Adamstown Road. This is a replacement fire station for the Carroll Manor Fire Company, which has outgrown their current location in Adamstown. A recent evaluation was conducted of this fire station through Tri-data, which evaluated their current fire station as "poor" in condition. Five acres of land for this fire station has been donated by the Butz family and has been deeded to the County. This facility will be designed per the full fire station program developed by the Division of Fire and Rescue Services (Middletown Fire Station prototype with modifications as required by site conditions). This will be a five-bay fire station with an administrative area.

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2026

2027

2028

2029

2030

2031 Costs After

NonCapital Furniture / Equipment

225,900

225,900

Site Improvement - NonBldg

104,029 104,029 1,008,839 1,008,839

Architect/Engineering

Construction

10,701,700

10,701,700

Construction - IIT Infrastruct

80,500 180,700 43,499 70,400

80,500 180,700 15,100 70,400

Inspectors - County Project Management Capital - IIT Hardware

28,399

Total Cost:

12,415,567 1,141,267 11,274,300

Funding Schedule:

Project Total

Prior Budget

Categories

2026

2027

2028

2029

2030

2031 Costs After

Trans from General Fund General Obligation Bonds

353,012

27,650 325,362

12,062,555 1,113,617 10,948,938 12,415,567 1,141,267 11,274,300

Total Cost:

21

Capital Project Summary

Capital Project Number: GG1034

Activity #: C1053.1053.01

Capital Project Title: Renovation of Westview Fire Station #31

Region: Frederick

Capital Project Status: In Progress Asset Type: Public Safety Asset Category: General Government

Year Identified: 2021 Est Completion Date: 12/31/2025

Capital Project Description: The Westview Fire Station, #31 originally built in 2001, has outgrown its intended purposes. Additional staffing and services have been added over the years causing the current facilities to be out-grown based on its current configuration. This CIP Request is to hire a design team to take the current footprint of the building (living area 5,000 sf) and reconfigure the layout to be more efficient based on staffing needs. This would include removal of all existing interior walls and redesign the current living area of the fire station to include kitchen, bunkrooms, office space, bathroom/locker rooms, dayroom, storage, etc. Because of land constraints, the footprint of the building cannot be increased.Also included in this project is expense related to continuity of operations, as the services this fire station provides will need to continue on a 24/7 basis. Temporary facilities will need to be included during the construction phase.

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2026

2027

2028

2029

2030

2031 Costs After

NonCapital Furniture / Equipment Architect/Engineering

98,100

96,100

2,000

418,377 418,377

Construction

3,944,600 1,532,500 2,412,100

Construction - IIT Infrastruct

31,300

18,300

13,000

Inspectors - County Project Management Capital - IIT Hardware

156,800 153,700

3,100

57,113 45,100

56,513 45,100

600

Total Cost:

4,751,390 2,320,590 2,430,800

Funding Schedule:

Project Total

Prior Budget

Categories

2026

2027

2028

2029

2030

2031 Costs After

Trans from General Fund General Obligation Bonds

246,580 246,580

4,504,810 2,074,010 2,430,800 4,751,390 2,320,590 2,430,800

Total Cost:

22

Made with FlippingBook - Online magazine maker