FY2026-FY2031 Proposed Capital Improvement Program
Capital Project Summary
Capital Project Number: WS1097
Activity #:
Capital Project Title: Water Systems (Non-New Design) Condition Assessment
Region: Countywide
Capital Project Status: Active Asset Type: Maintenance Asset Category: Water & Sewer
Year Identified: 2025 Est Completion Date: 6/30/2027
Capital Project Description: The project will engage engineering services to study the existing Water Systems, not included within New Design water distribution system. The purpose of the evaluation is to perform a multidiscipline field assessment (including structural integrity, Pump efficiency analysis, etc. ) to determine improvements, if required, to bring the facility within current standards and or recommendations for improvements for future needs.
Phase 1 = Copperfield, Cambridge Farm, Fountaindale Phase 2 = White Rock, Windsor Knolls, Libertytown East
Cash Requirement Schedule:
Project Total
Prior Budget
Categories
2026
2027
2028
2029
2030
2031 Costs After
Architect/Engineering Project Management
300,000 30,000 60,000 390,000
150,000 150,000
15,000 30,000
15,000 30,000
Overhead
Total Cost:
195,000 195,000
Funding Schedule:
Project Total
Prior Budget
Categories
2026
2027
2028
2029
2030
2031 Costs After
Trans from W/S Cash Fund
390,000 390,000
195,000 195,000 195,000 195,000
Total Cost: