FY2023 Adopted Operating and Capital Budget
FY2023 Adopted Budget Organizational Budgets
Public Works Division
Department of Facility Maintenance Mission Statement Maintains 184 buildings, located on 71 sites, with a total footprint exceeding 1.6 million square feet. Strategic Goals
County Strategic Goal Alignment: Prioritize Critical Infrastructure
Good Governance Provide effective preventive maintenance for installed equipment in all buildings and respond to work orders from building managers for plumbing, electrical, HVAC, carpentry, and painting requests.
FY 2020 FY 2021 FY 2022 FY 2023
Completion for Building Automation system installs/upgrades Preventative maintenance/inspections completed Construction Crew-Mechanical Equipment replaced/new install (units) Construction Crew-Carpentry Building Space Renovated (Sq.Ft.)
Target Actual Target Actual Target Actual Target Actual
6 6
6 6
7 7
8
--
480 460
480 600
480 480 100 180
480
--
--
100
--
90
--
--
10,000 12,000
10,000
--
10,250
--
Using a team approach, target critical infrastructure and systems to maintain the health of buildings, utilities, and technology, while minimizing total systemic costs. Reevaluate, identify, and fund in-house systemic needs at required levels. Examine systemic needs, priorities, and funding with a holistic lens focused on sustainability. Evaluate emerging technologies on a continuing basis, with pilot projects and studies implemented when metrics are promising. Preventive maintenance/inspections completed on time: HVAC ± inspection, filter changes, coil cleaning testing, ice machine cleaning Electrical ± electrical panel IR study
Plumbing ± backflow preventers, faucets, toilets, flushing water heaters, change UV lights and water filters, cleaning water fountains and changing filters, checking water pressure and pumps Emergency systems ± emergency lights test, exit signs, fire alarm, sprinkler system Carpentry ± elevators, door hardware ADA closures, roofs
427
Made with FlippingBook. PDF to flipbook with ease