FY2026-FY2031 Adopted Capital Improvement Program
FY2026 Adopted Budget Capital Improvement Program
Roads
x Reich’s Ford Road - This project will primarily focus on the existing two lane road from Bartonsville Road to Ijamsville Road to meet the County standards for a collector or modified collector road per the current comprehensive plan and to upgrade/replace two bridges over Bush Creek. Design funding is scheduled in FY27 x Yeagertown Road – This project will upgrade the existing tar and chip surface and serve future traffic growth. Construction funding is scheduled in FY29 x Monrovia East-West Connector – Additional funding to complete this project
x Braddock Heights Improvements – This project will include improvements to several streets within the Braddock Heights community. Construction funding is scheduled in FY28 x Artie Kemp Road – This project will improve a section of the road to include pavement reconstruction,
realignment, slope stabilization, drainage and installation of a retaining wall and guardrail. Construction funding is scheduled in FY26
x Michaels Mill Road – This project will provide rehabilitation of an existing section to include road widening, drainage and installation of a retaining wall and guardrail. Construction funding is scheduled in FY26 x Old National Pike Corridor – This project will improve the roadway from Bartholows Road east to the Mount Airy town limits. The project includes construction of on-street bike lanes, geometric improvements, drainage improvements and other safety upgrades. A study is scheduled in FY29, with design funding scheduled in FY30 x Ballenger Creek Pike Corridor – This project will improve the roadway section from Elmer Derr Road south to MD 28 in Point of Rocks. The project includes construction of on-street bike lanes, geometric improvements, drainage improvements and other safety upgrades. A study is scheduled in FY30, with design funding scheduled in the out years x New Design Road Corridor – This project will improve the roadway section from Harshman Way south to MD 28. The project includes construction of on-street bike lanes, geometric improvements, drainage improvements and other safety upgrades. A study is scheduled in FY31 and design funding is scheduled in the out years x Improvements to Urbana Pike – This project is for improvements to Urbana Pike between Sprigg Street and Urbana Church Road (South). The project includes sidewalk installation, drainage improvements, pavement reconstruction, parking improvements and traffic calming. A study is scheduled for FY27, with design funding in FY28 x Bethel Road Improvements – This project will improve a 1,700-foot section of Bethel Road to include installation of closed storm drain and associated road modifications with the removal of deep ditches along the roadway. A study is scheduled for FY28, with design funding in FY29 x Elmer Derr Road Realignment – This project will improve portions of Elmer Derr Road and Cap Stine Road and connect the Mount Zion interchange on US15/340 with the Ballenger Creek Pike/English Muffin Way roundabout. This project includes construction of on-street bike lanes, geometric improvements, drainage improvements and other safety upgrades. A study is scheduled for FY30, with design funding in the out years x Yellow Springs Road Improvements – This project will improve the portion of Yellow Springs Road between the Frederick City limits and Mountainview Drive. This project will include a new traffic signal at the intersection with Clover Hill Drive, sidewalk installation, road widening, drainage improvements and other safety upgrades. A study is scheduled for FY29, with design funding in FY30 Michaels Mill Road
139