FY2025 Proposed Capital Improvement Program

Capital Project Summary

Capital Project Number: BR1063

Activity #:

Capital Project Title: Bennies Hill Road Bridge Replacement (F03-22)

Region: Middletown

Capital Project Status: Active Asset Type: Bridges Asset Category: Bridges

Year Identified: 2024 Est Completion Date: 12/31/2032

Capital Project Description: Replace the current bridge, which was installed in 1982 with a large box culvert. Additional grading to assist water flow. Consultation will need to be done with Maryland Department of the Environment as the bridge is in the 100-year floodplain and studies will need to be performed on the hydrology.

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

Studies / Surveys

21,500 10,000 142,800 714,000 50,000 35,700 974,000

21,500

Land

10,000 142,800

Architect/Engineering

Construction

714,000 50,000

Inspectors - County Project Management

35,700

Total Cost:

57,200 152,800

764,000

Funding Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

General Obligation Bonds

974,000 974,000

57,200 152,800 57,200 152,800

764,000 764,000

Total Cost:

135