FY2025 Proposed Capital Improvement Program

FY2025 Proposed Capital Improvement Program

Fiscal 2025 Proposed Capital Improvement Program Budgets Jessica Fitzwater, County Executive

Crestwood Middle School Addition

Middletown Branch Library

Road and Bridge Infrastructure Projects

Maintaining Our Healthy County

Frederick County, Maryland Fiscal 2025 Proposed Capital Improvement Program

CONTENTS

PAGE

CAPITAL IMPROVEMENT PROGRAM ....C...I.P....C..a..l.e..n..d..a..r................................................................................................................................................................................... 1 ....I..n..t.r.o..d..u..c..t.i.o..n...................................................................................................................................................................................... 5 ....G...e..n..e..r.a..l..G...o..v..e..r.n..m...e..n..t....................................................................................................................................................................... 16 ....P...a.r..k..s..&....R...e..c..r.e..a.t..i.o..n.......................................................................................................................................................................... 74 ....W....a..t.e..r.s..h..e..d...R..e..s..t.o..r.a..t.i.o..n..................................................................................................................................................................... 92 ....R...o..a..d..s............................................................................................................................................................................................... 100 ....B...r.i.d..g..e..s............................................................................................................................................................................................. 118 ....H...i.g..h..w...a..y..s......................................................................................................................................................................................... 138 ....W....a..t.e..r..a..n..d...S..e..w...e..r............................................................................................................................................................................. 152 ....S...o..l.i.d...W....a.s..t.e...................................................................................................................................................................................... 176 ....F...r.e..d..e.r..i.c..k...C..o..m...m....u..n..i.t.y...C..o..l.l..e.g..e......................................................................................................................................................... 186 ....B...o..a..r.d...o..f...E..d..u..c..a..t.i.o..n.......................................................................................................................................................................... 196 ....M....u..n..i.c..i.p..a..l.i.t.i.e..s.................................................................................................................................................................................. 220

This Page Not Used

INTRODUCTION

This Page Not Used

FY2025 Proposed Budget Capital Improvement Program Budget Calendar

With input from the Capital Improvement Program Committee, Chief Administrative Officer, the Budget Director and Budget staff, and after meetings with County Divisions, the Board of Education (BOE), Frederick Community College (FCC) and Frederick County Public Libraries (FCPL), the County Executive proposes a capital improvement program budget to the County Council no later than April 15 th . The County Council shall then adopt the budget no later than May 31 st .

SEPTEMBER 2023

x Budget instructions for the Capital Improvement Program (CIP) are released to County Divisions, agencies and related organizations

OCTOBER 2023

x CIP base requests are due to the Budget Office

NOVEMBER 2023

x CIP appeal requests are due to the Budget Office

DECEMBER 2023

x County Executive conducts a public hearing to receive proposals to be included in the proposed budget

x CIP Committee meets with requesting organizations to discuss requests and develops a recommended CIP plan

JANUARY 2024

FEBRUARY 2024

x The County Executive and Budget Office staff begin meeting to review CIP budget projections and overview of requests

FEBRUARY/ MARCH 2024

x The County Executive and Budget Director meet with requesting organizations to review CIP budget requests

x Public outreach on budget priorities (for FY25 used Balancing Act tool) x The County Executive releases a draft budget and holds a public hearing to receive public comments on the budget requests x By April 15 th , the County Executive is required to submit a Proposed Budget to the Council, along with a budget message, supporting tables and a financial plan that explains the Proposed Capital Budget and the Capital Improvement Program

MARCH 2024

APRIL 2024

x The County Council holds at least one public hearing on the budget x The County Council holds budget workshops with County staff and independent agencies

APRIL/MAY 2024

x By May 31 st the County Council shall adopt the budget. If the Council does not vote to adopt the budget, the budget as proposed by the County Executive becomes law

MAY 2024

1

This Page Not Used

2

CAPITAL IMPROVEMENT PROGRAM (CIP) FY2025-2030

This Page Not Used

FY2025 Proposed Budget Capital Improvement Program

Introduction

The approved six year Capital Improvement Program (CIP) for fiscal years 2025 – 2030 is hereby presented. The CIP budget was proposed on April 15, 2024. Criteria Projects that meet the definition of a capital improvement are included in the CIP. Capital improvements are defined as: - will add to the government’s public infrastructure OR - will result in a major repair of a fixed asset that significantly adds to or preserves the life of the original asset OR - will establish or enhance internal computer/program systems. This excludes routine expenses such as maintenance, license renewals, etc. The project will also have an individual project cost totaling $100,000 or more. Projects of less than $100,000 will only be permitted when required for State or Federal funding; and multiple projects in a single category, totaling $100,000 or more, will also be considered if they meet all other characteristics. Acquisition of land for future projects (land banking) will be eligible when it has been identified as a need in the six-year CIP, in the County Comprehensive Plan, or when it can be shown as necessary and based on recent growth trends. Municipal projects will be considered if the project is not exclusively for municipal residents or if the project is a cooperative effort by municipal, county and/or state agencies. Operating costs that are associated with the capital projects are located in the Capital Budget Fund section of the Operating Budget. These costs will impact the Operating Budget once a project has been completed.

Proposed CIP was able to identify full or partial funding for 164 projects that totaled $1,752,684,956.

CATEGORY

PROPOSED $ 335,186,824

In Millions of dollars

General Government Parks & Recreation Watershed Restoration

356.2

51,740,592 47,534,900 207,612,723 339,454,013 15,766,280 73,922,799 680,291,825

313.4

322.0

$0 $100 $200 $300 $400

281.9

249.1

230.0

Transportation Water and Sewer

Solid Waste

Community College Board of Education

Municipalities

1,175,000

FY2025 FY2026 FY2027 FY2028 FY2029 FY2030

TOTAL

$ 1,752,684,956

5

FY2025 Proposed Budget Capital Improvement Program

Introduction

REVENUE SOURCES Funding for the Capital Improvement Program comes from many sources, primarily pay-go (general fund, recordation tax, and impact fee), bonds (general fund, recordation tax, and impact fee), enterprise user fees, state & federal grants and developer participation. Revenue sources are increasing, however balancing requests with available cash and “affordable” debt will continue to impact the CIP.

Proposed

General Fund

335,755,159 566,178,824 21,967,532 11,156,999 7,645,185 3,000,000 46,067,857 19,775,796 50,030,003 157,886,606 137,548,792 30,893,537 207,906,612 147,358,104 - 9,513,950 -

General Fund Bonds/Lease Recordation Taxes - Parks Recordation Tax Bonds - Parks Recordation Taxes - Schools Recordation Tax Bonds - Schools

Impact Fees - Library

Impact Fees Bonds -Library

Impact Fees -Schools

Impact Fee Bonds - Schools Mitigation Fees - Schools Enterprise Fund Pay-go Enterprise Fund Bonds

Grants - State Grants - Federal

Cash - Forward Fund State

Other

TOTAL

$

1,752,684,956

REVENUE SOURCES

l d

6

This Page Not Used

7

FY2025 - 2030 Proposed Capital Improvement Program Summary - All Projects

Asset Category General Government Parks & Recreation

6-year **

Total Project 654,248,021 126,546,414 97,763,617 93,094,904 38,589,752 162,449,800 504,998,073 19,769,580 158,957,927 939,758,283 2,292,590

Prior

2025

2026

335,186,824 51,740,592 47,534,900 50,464,500 25,474,792 131,673,431 339,454,013 15,766,280 73,922,799 680,291,825 1,175,000

137,223,214 31,098,122 50,228,717 2,825,300 9,996,800 22,436,142 165,544,060 4,003,300 14,016,628 189,170,497 1,117,590 627,660,370 95,238,619 165,214,028 28,957,553 23,490,700 5,279,172 32,074,008 116,419,023 160,987,267 627,660,370

73,915,966 4,113,786 7,406,400 4,455,816 7,874,596 20,053,241 62,316,842 4,933,880 2,930,000 93,840,249 100,000 281,940,776 52,895,741 105,226,998 1,788,697 4,018,667 1,264,692 47,089,792 34,105,200 35,550,989 281,940,776

66,746,872 14,046,506 8,434,400 3,845,736 2,209,168 18,061,945 38,989,452 7,446,480 10,836,050 142,546,325

Watershed Restoration & Retrofit

Roads Bridges Highways

Water & Sewer Solid Waste

Community College Board of Education Municipalities

200,000

Total Expense

1,752,684,956 2,798,468,961

313,362,934

Funding General Fund

335,755,159

444,929,010

60,600,268 99,050,152 14,411,497 11,660,691 2,000,000 25,527,441 21,059,730 79,053,155 313,362,934

General Fund Bonds & Capital Leases

566,178,824 1,003,425,790

Recordation Tax & Bonds Impact Fees & Bonds School Mitigation Fee Enterprise Fees & Bonds

42,638,481 56,713,042 19,775,796 207,916,609 168,442,329 355,264,716

109,918,859 86,453,742 25,054,968 239,990,617 330,329,438 558,366,537

Grants Other

Total Funding Sources

1,752,684,956 2,798,468,961

** The 6-year is the sum of FY 2025 through FY 2030.

8

FY2025 - 2030 Proposed Capital Improvement Program Summary - All Projects - Continued

Asset Category General Government Parks & Recreation

2027

2028

2029

2030

Costs After 181,837,983 43,707,700 39,805,104 3,118,160 8,340,227 0

38,459,147 13,453,950 8,727,100 10,184,824 3,785,808 25,956,195 24,259,542 2,646,480 15,750,742 105,688,255

59,400,383 5,847,650 8,005,900 2,433,288 3,945,436 21,056,230 166,133,356 246,480 2,923,354 85,944,867 275,000 356,211,944 53,529,625 88,117,994 4,326,812 4,204,873 121,971,498 19,295,776 64,765,366 356,211,944 0

54,373,178 6,889,550 6,861,100 11,111,824 1,004,480 23,137,235 21,731,542 246,480 21,572,175 174,849,006

42,291,278 7,389,150 8,100,000 18,433,012 6,655,304 23,408,585 26,023,279 246,480 19,910,478 77,423,123 150,000 230,030,689 54,655,175 79,937,955 4,130,133 9,612,090 3,000,000 4,425,694 36,130,210 38,139,432 230,030,689

Watershed Restoration & Retrofit

Roads Bridges Highways

Water & Sewer Solid Waste

0 0

Community College Board of Education Municipalities

71,018,500 70,295,961

200,000

250,000

0

Total Expense

249,112,043

322,026,570

418,123,635

Funding General Fund

54,109,192 80,367,565 12,407,271 6,915,185 11,511,104 6,915,092 24,760,494 52,126,140 249,112,043

59,965,158 113,478,160 5,574,071 20,301,536 2,000,000 1,987,092 33,090,919 85,629,634 322,026,570

13,935,232 272,032,938 38,322,825 6,250,000 45,468,086 42,114,554 418,123,635 0 0

General Fund Bonds & Capital Leases

Recordation Tax & Bonds Impact Fees & Bonds School Mitigation Fee Enterprise Fees & Bonds

Grants Other

Total Funding Sources

9

FY2025 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

CE Proposed Construction Year

PUBLIC SAFETY (General Government) Project Name

Project #

Notes

GG1028 Green Valley Fire Station GG1031 Carroll Manor Fire Station

2024 2026 2025

2024 2026 2025

No Change No Change No Change

GG1035 Renovation of Westview Fire Station #31

GG1035 Jefferson Tech Fire Station

Design 2028

Design 2029 Delayed 1 year 2029: Design New Project 2024/25 No Change

GG1036 *Renovation of Spring Ridge Fire Station

2024/25

GG1080 SCBA Replacement GG1088 PSTF Training Building

2021

2021, 2025 Additional funding added to project

FY25 moved to new Tilco Unit A project: Additional year funded: FY28

GG1089 Emergency Generator Replacement (DFRS)

2022/23, 2025 2022/23, 2028

GG1090 Fire Service Water Supply Locations

2025,27

2025,27 No Change

GG1092 Hazmat Team Meters

2024-26, 2028, 2030

2024-26, 2028

Additional funding added to FY30

GG1098 Fire Apparatus and Vehicle Replacement

On-going

On-going No Change

GG1109 ADC Courtyard Offices

2026

2026

No Change

2025-2027

2025-2027 No Change

GG1156 Sheriff Office Mobile Data Terminal Replacements GG1160 Sheriff's Department District Office GG1162 *Law Enforcement Center Renovation GG1164 *Sheriff's office Dell Isilon upgrade GG1198 Portable Radio Replacement GG1200 Public Safety communications site systemics GG1201 County Radio System upgrade to MPLS/microwave upgrade

2027

2029

Delayed 2 years

2028/29: Design New Project 2025/2030 New Project

2023

2029-30 Additional funding years added

2025-2030

2025-2030 No Change

2028

2028 2026

No Change New Project

GG1202 *Radio System Improvements

Current Construction Year

CE Proposed Construction Year

MISCELLANEOUS BUILDINGS AND SYSTEMICS (General Government) Project Name

Project #

Notes

GG2019 Courthouse Capacity Improvements Project GG2030 Public Safety Training Facility Maintenance Shop and Garages GG2037 30 North Market Street First Floor Redesign GG2038 Montevue Campus Renovations/Reconfiguration

2025/26, 2028 2025, 2029, 2031 Delayed 3 years

2029

2029

No Change

2021/22, 24 2021/22, 24/25 Funding residual

2030 2024 2027 2025 2024 2028 2028

2031

Delayed 1 year

GG2039 Animal Control Addition

2024/25 Funding residual

GG2045 Prospect Center Building Acq & Build Out GG2046 East County Senior Center GG2047 General Acquisition Account GG2049 Montevue Renovation GG2050 Taney Ave Senior Center Renovation

2022-2029

2022-2028 Additional funding: moved up 1 year

2028

Added Study 2025: Delayed 1 year

2025, 2027, 2029 Additional funding 2024/25 Funding residual

2030 2032

Delayed 2 years Delayed 4 years

GG2051 Brunswick Senior Center GG2052 Montevue Senior Living

2028: Design 2029: Design Delayed 1 year

GG2053 *Extension Service Building Renovation GG4199 Maintenance Systemics - General

2030: Study New Project

On-going 2024/25

On-going

GG6003 CEAP Energy & Resiliency

2024/25 Funding residual 2025,27,29 New Project 2026,28,30 New Project

GG6005 *EV Infrastructure GG6006 *CEAP Planning

Current Construction Year

CE Proposed Construction Year

Project #

LIBRARY (General Government) Project Name

Notes

GG3006 Linganore Town Center Library GG3007 Westside Library GG3008 North Frederick Library GG3009 C Burr Artz Library Renovation

2028 2026 2029 2031

2030 2026 2031 2033

Delayed 2 years

No change

Delayed 2 years Delayed 2 years

GREEN Additional funding added or New Project ORANGE Partial request funded RED Project delayed

* Denotes "New" project

10

FY2025 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

CE Proposed Construction Year

Project #

TECHNOLOGY (General Government) Project Name

Notes

GG5001 IIT Systemics- General

On-going On-going On-going On-going On-going On-going On-going

On-going No Change On-going No Change On-going No Change On-going No Change On-going No Change On-going No Change On-going No Change

GG5005 LEAPS

GG5006 Enterprise GIS GG5008 Financial System GG5009 Land Management

GG5016 Enterprise Asset Management Software GG5080 Video Services On-going Replacement/Upgrade

Current Construction Year

CE Proposed Construction Year

Project #

PARKS AND RECREATION Project Name

Notes

On-going

On-going Reduced funding FY25-27

PR0001 Acquisition

PR1023 Othello RP Phase 2

2026 2025 2030 2029

2027 2026 2032 2031

Delayed 1 year Delayed 1 year Delayed 2 years Delayed 2 years

PR1036 Richard W. Kanode Farm Park PR1037 North County Regional Park PR1039 Calico Rocks Regional Park-Phase I PR1040 Green Hill Park-Phase 2 PR1041 Centerville Community Park

Design 2028 Study 2029

Design 2030 Delayed 2 years Study 2030 Delayed 1 year On-going No Change

PR2000 Parks Systemic

On-going

PR2009 Ballenger Creek Park Maintenance Area & Widrick House Rehabilitation PR2010 Playground Replacement and Reconstruction PR2011 Rose Hill Manor Park Carriage Museum

2026

2027

Delayed 1 year

Various

Various

No Change

2024

2024/25 Residual funding

PR2012 River Access Master Plan

Master Plan; 2029 Master Plan; 2030 Delayed 1 year

PR2013 Ballenger Creek Park Synthetic Turf Field Carpet Replacement

2029

2030

Delayed 1 year

PR3001 Bikeways/Trails Program

Various

Various

Added additional funding in FY25

PR8002 South County YMCA, Indoor Pool Partnership

2022-2025

2022-2025 No Change

Current Construction Year

CE Proposed Construction Year

Project #

WATERSHED RESTORATION Project Name

Notes

Re-aligned funding between projects in the Watershed Restoration category based on timing, value, etc

WR1026 County-Owned Stormwater Facility Retrofits

On-going

On-going

WR1039 Reforestation Program WR1042 Stream Restorations

On-going On-going On-going On-going

On-going No Change On-going No Change On-going No Change On-going No Change

WR1044 Non-County Owned Stormwater Facility Retrofits

WR1099 Watershed Systemics

GREEN Additional funding added or New Project ORANGE Partial request funded RED Project delayed

* Denotes "New" project

11

FY2025 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

CE Proposed Construction Year

Project #

ROADS Project Name

Notes

RD1061 Reichs Ford Road - Ph 2 RD1064 Yeagertown Road

2030 2029 2025 2027 2026 2026

2030 2029 2025 2027 2026 2026

No Change No Change No Change No Change No Change No Change

RD1066 White Rock Subdivision Improvements RD1070 Braddock Heights Improvements

RD1072 Artie Kemp Road RD1073 Michaels Mill Road RD1074 Old National Pike Corridor

Study: 2028; Design 2029 Study: 2026 Design: 2028 Study: 2027 Design: 2029

Study: 2029; Design 2030 Study: 2030 Design: 2032 Study: 2031 Design: 2033

Delayed 1 year

RD1075 Ballenger Creek Pike Corridor

Delayed 4 years; per division prioritization

RD1076 New Design Road Corridor

Delayed 4 years; per division prioritization

RD1077 Improvements to Urbana Pike

Study: 2027: 2030 Study: 2027: 2030 No change

Study: 2028 Design: 2029

Study: 2028 Design: 2029

RD1078 Bethel Road Improvements

No change No change

2026

2026

RD1079 Mountville Road Streetscape RD1080 *Elmer Derr Road Realignment RD1081 *Yellow Springs Road Improvements

Study: 2029 New Project

Study: 2029; Design 2030

New Project

Current Construction Year

CE Proposed Construction Year

Project #

BRIDGES Project Name

Notes

BR1032 Brethren Church Rd Br

2022-24 2021-24

2022-25 Residual funding 2021-25 No Change

BR1033 Hessong Bridge Road Bridge (F15-01) BR1038 Biggs Ford Road Bridge F26-04 BR1049 Stottlemeyer Road Bridge Deck Replacement

2025 2025 2026 2027 2028 2024 2027 2030 2030 2030

2025 2025 2026 2027 2028 2027 2030 2030 2030

No Change No Change No Change No Change No Change No Change No Change No Change No Change

BR1052 Sixes Bridge Road Bridge BR1053 Oppossumtown Pike Bridge

BR1054 Lynn Burke Road Bridge Replacement

BR1055 Covell Road Bridge BR1056 Holter Road Bridge

2024-25 Residual funding

BR1057 Hessong Bridge Road Bridge (F20-21) BR1058 Dollyhyde Road Bridge BR1059 Bridge at Prices Distillery Road BR1060 Bullfrog Road Bridge F05-06 BR1061 Loys Station Covered Bridge F04-02 BR1063 *Bennies Hill Road Bridge Replacement BR1064 *Roy Shafer Road Abutmant Replacement BR1062 Park Mills Road Culvert

Design: 2029

Design: 2029 No Change

Design: 2029 Design: 2029 No Change

2028

2028

No Change

Design: 2030 New Project Design: 2029 New Project

Current Construction Year

CE Proposed Construction Year

Project #

HIGHWAYS Project Name

Notes

Reduced FY25 funding: Adjusted funding between fiscal years

HW1001 Pavement Management Program

On-Going On-Going 2025/26 2023/24 Various 2022/25

On-Going

HW1050 Highway Network Systemic - General HW1090 Sidewalk Retrofit Program HW1095 Pedestrain and Bicycle Missing Links HW1101 Traffic Control and Safety HW1201 Cloverhill Stormdrain Improvements HW1202 Drainage Assessment Response Team (DART) HW3002 Thurmont & Johnsville Satellite Facility Improvements

On-Going Additional funding in FY25; FY26-FY30 no change

2025/26 No Change 2023-25 Residual funding

Various

No Change

2022/25/26 Residual funding

Various

Various

No Change No Change

2027 2030

2027 2031

HW3006 Frederick Satellite Yard HW3007 Intercoastal Drive Brine Systems

Delayed 1 year

2022/2024

2022/24/25 Residual funding

GREEN Additional funding added or New Project ORANGE Partial request funded RED Project delayed

* Denotes "New" project

12

FY2025 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

CE Proposed Construction Year

Project #

WATER/SEWER Project Name

Notes

WS1001 Ballenger-McKinney WWTP Sludge Management WS1002 Sewerage Problem Area Remediation WS1009 Inflow & Infiltration 1 201A-S WS1012 Linganore Interceptor 1 - Lower Reach WS1013 Linganore Interceptor 2 - Upper Reach WS1017 Water Storage Tank Improvements WS1028 Developer-Funded Infrastructure WS1047 Maintenance Building Expansion/Relocation WS1062 New Design WTP Sludge Thickener No. 2 WS1066 Water Distribution Improvements WS1075 Crestwood Plaza Water Meter Relocation WS1076 Concrete Water Tank Recoating Project WS1080 Pont of Rocks WWTP Renovation WS1081 Ballenger McKinney Pump Header Replacement WS1088 Buckeystown Interceptor Sewer Rehabilitation WS1089 Ballenger WWTP Electrical Services Improvements WS1101 DUSWM Maintenance Systemics - Ballenger Wastewater WS1102 DUSWM Maintenance Systemics - Small Systems Wastewater WS1108 DUSWM Maintenance Systemics - Water WS1084 Water Meter Relocations WS1087 Refurbish Bolted Steel Water Tanks

2028 2029 2024 2029 2029

2028 2030 2024 2030 2030

No Change

Delayed 1 year per division

No Change

Delayed 1 year per division Delayed 1 year per division

2022-2026 On-Going

2022-2026 No Change On-Going No Change

Funding split per the division based on anticipated project

2025 2024

2025/26

2024/25 Residual funding

2023-2026

2023-2026 No Change

2023/24 2024/25 2024/25 2024/25

2023-25 Residual funding

2024/25 No Change 2024/25 No Change 2024/25 No Change 2025-2027 No Change 2024-2028 No Change

2025-2027 2024-2028

2026

2026

No Change

2024/25

2024/25 No Change

On-Going

On-Going No Change

On-Going On-Going

On-Going No Change On-Going No Change

Current Construction Year

CE Proposed Construction Year

Project #

SOLID WASTE Project Name

Notes

SW1004 DWSR Maintenance Systemics - Solid Waste SW1007 Leachate Treatment/ Office Facilities Rehabilitation

On-Going 2023/24

On-Going No Change

2023-27 Additional funding and in future years

SW1010 Transfer Station Project SW1011 *Transfer Station Floor Repair SW1012 *Paradigm Program Replacement SW1013 *Flare Regulation Compliance

2024

2024/25 Residual funding

2025 2025 2025

New Project New Project New Project

GREEN Additional funding added or New Project ORANGE Partial request funded RED Project delayed

* Denotes "New" project

13

FY2025 Proposed Budget Capital Improvement Program

Summary of Changes

Current Construction Year

CE Proposed Construction Year

Project #

COMMUNITY COLLEGE Project Name

Notes

2029/30

2029/30 Project scope changed design funding moved up

FC1023 Health Education and Athletics Center (Bldg D) FC2009 Campus Services Building (Bldg P) FC2011 *Innovation and Technology Center

2024-2026 2024: 2026-2027 Delayed 1 year

2030

New Project

FC5007 Technology Upgrade

On-Going On-Going On-Going

On-Going No Change

FC5008 Classroom Technology Upgrades

On-Going Some additional funding On-Going Some additional funding

FC5012 FCC Systemics

Current Construction Year

CE Proposed Construction Year

Project #

BOARD OF EDUCATION Project Name

Notes

AP1102 *Dedicated Reserve for Future Years for School Construction

2025-2030 New Project

ED1022 Yellow Springs ES Replacement

2025 2026 2026

2025 2026 2029

No Change No Change

ED1024 Middletown combined ES/MS replacement building

ED1025 Liberty ES Replacement

Moved back 3 years per BOE

ED1041 *Brunswick High School Replacement

Design: 2027; 2029

New Project No Change No Change

ED1046 Valley ES Replacement/Addition ED1047 Crestwood Middle School

2024 2024

2024 2024

ED1048 New ES Site #41 (formerly Easter ES) ED1050 Green Valley ES Replacement/Addition ED1051 New ES Site #42 (Southern Frederick area ES) ED1052 Walkersville MS: Modernization Study ED5002 Limited Renovations Systemics ED5902 Monocacy ES Limited Renovations ED5903 Spring Ridge ES Limited Renovations ED5904 Ballenger Creek ES Limited Renovations ED5905 *Twin Ridge ES Limited Renovations ED5906 *Hillcrest ES Limited Renovations ED2001 FCPS Bus Facility ED5001 Systemics - Generic

2026/27

2026/27 No Change

2024 2029

2024 2027

No Change

Moved up 2 years

Study: 2027 2024-2027 On-Going On-Going

Study: 2027 No Change 2024-2027 No Change On-Going No Change On-Going No Change 2023/24 No Change 2024/25 No Change 2026/27 New Project 2026-2028 New Project

2023/24 2024/25

2024-2026

2024/25 Funding moved up 1 year

2025

2025

Added two buses for FY25

ED6001 New Buses-Capacity ED7017 Portable Classrooms FY2025

On-Going

On-Going Added Additional Funding FY25

Current Construction Year

CE Proposed Construction Year

Project #

MUNICIPALITIES Project Name

Notes

MP1001 Frederick Municipal Airport

Various

Various

No Change

GREEN Additional funding added or New Project ORANGE Partial request funded RED Project delayed

* Denotes "New" project

14

CIP – GENERAL GOVERNMENT

FY2025 - 2030 Proposed Capital Improvement Program General Government

Project

6-year

Total Project

Prior

2025

2026

Public Safety

Green Valley Fire Station Carroll Manor Fire Station

699,021 11,048,847 1,924,500 2,973,300 95,000 810,300 3,627,007 1,300,000 500,000 819,700 173,000 1,710,993 18,481,275 1,066,304 7,589,700 1,791,800 750,200 6,000,000 705,120 1,175,200

8,351,746 12,190,114 2,320,590 13,355,201 95,000 810,300 6,800,000 3,046,235 1,795,800 1,067,700 378,514 1,710,993 23,861,275 1,701,732 8,589,700 1,791,800 750,200 11,762,500 705,120 1,175,200

7,652,725 1,141,267 396,090

699,021

0

0

11,048,847

Renovation of Westview Fire Station #31

1,924,500

0 0 0 0 0 0 0 0

Jefferson Tech Fire Station

0 0 0

0 0

Renovation of Spring Ridge Fire Station

Tilco Unit A Renovation SCBA Replacement PSTF Training Building

810,300 3,627,007 1,300,000

3,172,993 1,746,235 1,295,800 248,000 189,614

Emergency Generator Replacement (DFRS) Fire Service Water Supply locations PSTF Driving / Multi-Purpose Training Course Fire Apparatus and Vehicle Replacement Sheriff Office Mobile Data Terminal Replacements Sheriff's Department District Office Law Enforcement Center Renovation Sheriff's Office Dell Isilon Upgrade Hazmat Team Meters

0

364,300 33,800

116,300

0

0

0

0

4,689,303 266,576

2,428,000 266,576

635,428

1,000,000

0 0

0 0 0 0

0 0 0 0

375,100

Portable Radio Replacement

5,762,500

0

Public safety communications site systemics

117,520

117,520

County radio system upgrade to MPLS/microwave upgrade Radio System Improvements

0

0

3,300,000

3,300,000

0

0

3,300,000 17,277,243

Total: Public Safety

66,541,267 105,559,720

23,240,652

14,207,427

Other

Unallocated Project ADC Courtyard Offices

2,625,660 825,000 8,262,493 5,946,000

2,625,660 1,068,687 85,755,201 5,946,000

0

2,625,660

0

243,687 3,825,648

0

825,000

Courthouse Capacity Improvements Project Public Safety Training Facility Maintenance Shop and Garages 30 North Market Street First Floor Interior Redesign Montevue Campus Renovation and Reconfiguration Animal Control Addition Value Added Agriculture Facility Prospect Center Building Acq & Build Out East County Senior Center General Acquisition Account Montevue Renovation Brunswick Senior Center Montevue Senior Living Taney Ave. Senior Center Renovation Extension Service Building Renovation Montevue Warehouse Complex

1,000,000

0 0

0

0

200,000

806,130

606,130

200,000

0

933,600

6,601,422

0

0

0

339,000 (25,000)

9,844,971

9,505,971

339,000 (25,000)

0 0

40,000

65,000

105,704,831 149,071,135

43,366,304

37,198,607 300,000 2,573,500 2,623,730

26,753,112 1,310,400

14,688,250 3,573,500 2,623,730 6,462,900 1,300,000 1,534,300

14,688,250 4,073,500 10,439,000 6,462,900 14,507,200 21,338,000 4,558,500 1,245,600 1,948,435 1,175,000 750,000

0

500,000 7,815,270

0 0 0 0 0 0 0 0 0

0

0 0 0 0 0

200,000

0 0 0 0 0

90,000

0

CEAP-Energy & Resiliency

825,000 1,175,000 750,000

1,123,435

825,000 575,000

EV Infrastructure CEAP Planning

0

250,000

Total: Other

157,834,264 342,945,591

67,251,445

48,235,497

29,138,512

Library Linganore Town Center Library Westside Library North Frederick Library C Burr Artz Library Remodel

21,872,800 8,919,200 4,005,700

21,872,800 11,099,200 26,188,400 26,017,600 85,178,000

0

0 0 0 0 0

0

2,180,000

8,919,200

0 0

0 0

0

Total: Library

34,797,700

2,180,000

8,919,200

16

FY2025 - 2030 Proposed Capital Improvement Program General Government - Continued

Project

2027

2028

2029

2030

Costs After

Public Safety

Green Valley Fire Station Carroll Manor Fire Station

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

Renovation of Westview Fire Station #31

Jefferson Tech Fire Station

2,973,300

10,381,901

Renovation of Spring Ridge Fire Station

95,000

Tilco Unit A Renovation SCBA Replacement PSTF Training Building

0 0 0 0 0 0 0

Emergency Generator Replacement (DFRS) Fire Service Water Supply locations PSTF Driving / Multi-Purpose Training Course Fire Apparatus and Vehicle Replacement Sheriff Office Mobile Data Terminal Replacements Sheriff's Department District Office Law Enforcement Center Renovation Sheriff's Office Dell Isilon Upgrade Hazmat Team Meters

500,000

455,400

0

0

18,200

4,700

15,900

209,181

1,501,812

0

0

3,642,000 266,576

1,197,000

399,000

6,125,972 266,576

5,380,000

0

0

0

1,096,200

0

6,493,500 1,507,700 3,000,000 117,520 0

0 0

0 0 0 0 0 0

0 0 0

284,100

0 0

375,100 3,000,000 117,520

Portable Radio Replacement

Public safety communications site systemics

117,520

117,520 1,175,200

County radio system upgrade to MPLS/microwave upgrade Radio System Improvements

0

0

0

0

0

0

0

0

Total: Public Safety

5,786,877

4,793,832

14,586,020

9,889,868

15,777,801

Other

Unallocated Project ADC Courtyard Offices

0 0 0 0

0 0 0

0 0 0

0 0

0 0

Courthouse Capacity Improvements Project Public Safety Training Facility Maintenance Shop and Garages 30 North Market Street First Floor Interior Redesign Montevue Campus Renovation and Reconfiguration Animal Control Addition Value Added Agriculture Facility Prospect Center Building Acq & Build Out East County Senior Center General Acquisition Account Montevue Renovation Brunswick Senior Center Montevue Senior Living Taney Ave. Senior Center Renovation Extension Service Building Renovation Montevue Warehouse Complex

7,262,493

73,667,060

462,000

5,484,000

0

0

0

0

0

0

0

0

0

933,600

0

5,667,822

0 0

0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0 0

18,823,112

22,930,000 13,077,850

0

500,000

0 0 0 0 0 0 0 0

500,000

0 0 0 0 0 0 0

792,100

5,670,800 1,300,000

13,007,200 19,803,700 4,468,500 1,245,600

1,534,300

0

90,000

0 0 0

CEAP-Energy & Resiliency

0 0 0

EV Infrastructure CEAP Planning

300,000

300,000

0

250,000

0

250,000

Total: Other

19,623,112

37,511,950

8,751,900

14,573,293 117,859,882

Library Linganore Town Center Library Westside Library North Frederick Library C Burr Artz Library Remodel

1,338,900

0 0

16,837,600

3,696,300

0 0

0

0

0 0 0

293,800

1,762,800

1,949,100

22,182,700 26,017,600 48,200,300

0

0

0

Total: Library

1,632,700

1,762,800

18,786,700

3,696,300

17

FY2025 - 2030 Proposed Capital Improvement Program General Government - Continued

Project

6-year

Total Project

Prior

2025

2026

Maintenance/Systemic Maintenance Systemics - General

42,177,300 42,177,300

42,177,300 42,177,300

0 0

5,831,300 5,831,300

4,926,900 4,926,900

Total: Maintenance/Systemic

Technology

IIT Systemics - General

20,123,664 4,518,150 1,052,538 4,744,059 857,082 1,762,800

29,993,653 19,379,489 3,875,651 10,849,822 3,511,300 7,747,152

9,869,989 14,861,339 2,823,113 6,105,763 2,654,218 5,984,352

4,123,600 753,025 279,423 142,847 142,847

3,183,616 753,025 279,423 1,438,506 142,847 587,600

LEAPS

Enterprise GIS Financial Systems Land Management

Enterprise Asset Management (EAM)- software

0

Video Services On-going Replacement/Upgrade

778,000

3,030,343

2,252,343

200,000

100,000

Total: Technology

33,836,293

78,387,410

44,551,117

5,641,742

6,485,017

Total Expense

335,186,824 654,248,021 137,223,214

73,915,966

66,746,872

Funding General Fund

79,228,591 140,437,671 232,108,628 462,875,100

55,496,587 63,890,982 720,000 2,526,648 7,435,238 7,153,759

18,635,960 50,470,936

10,277,736 48,435,066 4,000,000

General Fund Bonds & Capital Leases

Impact Fees & Bonds Enterprise Fees & Bonds

10,645,185

17,615,185 2,581,068 23,585,238 7,153,759

0

54,420

9,070

9,070

Grants Other

13,150,000

4,800,000

4,025,000

0

0

0

Total Funding Sources

335,186,824 654,248,021 137,223,214

73,915,966

66,746,872

18

FY2025 - 2030 Proposed Capital Improvement Program General Government - Continued

Project

2027

2028

2029

2030

Costs After

Maintenance/Systemic Maintenance Systemics - General

6,814,700 6,814,700

8,894,800 8,894,800

7,854,800 7,854,800

7,854,800 7,854,800

0 0

Total: Maintenance/Systemic

Technology

IIT Systemics - General

3,183,616 753,025 279,423 142,847 142,847

3,265,600 753,025 1,438,506 142,847 587,600 71,423

3,183,616 753,025 71,423 142,847 142,847

3,183,616 753,025 1,438,506 142,847 587,600 71,423

0 0 0 0 0 0

LEAPS

Enterprise GIS Financial Systems Land Management

Enterprise Asset Management (EAM)- software

0

0

Video Services On-going Replacement/Upgrade

100,000

178,000

100,000

100,000

0

Total: Technology

4,601,758

6,437,001

4,393,758

6,277,017

0

Total Expense

38,459,147

59,400,383

54,373,178

42,291,278 181,837,983

Funding General Fund

15,604,427 21,775,465 645,185

15,574,926 43,816,387

9,424,387 36,939,721 5,500,000

9,711,155

5,712,493

General Fund Bonds & Capital Leases

30,671,053 166,875,490

Impact Fees & Bonds Enterprise Fees & Bonds

0

500,000

6,250,000

9,070

9,070

9,070

9,070

0

Grants Other

425,000

0 0

2,500,000

1,400,000

3,000,000

0

0

0

0

Total Funding Sources

38,459,147

59,400,383

54,373,178

42,291,278 181,837,983

19

Capital Project Summary

Capital Project Number: GG1028

Activity #: C1028.1028.01

Capital Project Title: Green Valley Fire Station

Region: Urbana

Capital Project Status: In Progress Asset Type: Public Safety Asset Category: General Government

Year Identified: 2017 Est Completion Date: 5/28/2026

Capital Project Description: A proposed expansion of the existing fire station has been shown to be not feasible. The feasibility study determined that the expansion will not meet the program needs of DFRS. This request is to provide a new facility designed per the substation program (four-engine-bay station and operational facilities).

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

NonCapital Furniture / Equipment

241,471 232,171

9,300

Site Improvement - NonBldg

80,000

80,000

Architect/Engineering

525,530 525,530

Construction

7,114,943 6,429,222 685,721

Construction - IIT Infrastruct

98,132

98,132

Inspectors - County Project Management

170,128 166,428

3,700

36,008

35,708

300

Capital - Furniture / Equipmen

0

Capital - IIT Hardware

85,534

85,534

Total Cost:

8,351,746 7,652,725 699,021

Funding Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

Trans from General Fund General Obligation Bonds

607,319 594,019

13,300

7,744,427 7,058,706 685,721 8,351,746 7,652,725 699,021

Total Cost:

20

Capital Project Summary

Capital Project Number: GG1031

Activity #: C1052.1052.01

Capital Project Title: Carroll Manor Fire Station

Region: Adamstown

Asset Type: Public Safety Asset Category: General Government

Year Identified: 2019 Est Completion Date: 12/1/2026

Capital Project Status: Active

Capital Project Description: The new fire/rescue station will be located at Route 85 and Adamstown Road. This is a replacement fire station for the Carroll Manor Fire Company, which has outgrown their current location in Adamstown. A recent evaluation was conducted of this fire station through Tri-data, which evaluated their current fire station as "poor" in condition. Five acres of land for this fire station are being donated by the Butz family and will be deeded to the County. This facility will be designed per the full fire station program developed by the Division of Fire and Rescue Services (Middletown Fire Station prototype, with modifications as required by site conditions). This will be a five-bay fire station with an administrative area.

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

NonCapital Furniture / Equipment

221,500

221,500

Site Improvement - NonBldg

104,029 104,029 1,008,839 1,008,839

Architect/Engineering

Construction

10,491,900

10,491,900

Construction - IIT Infrastruct

74,447 177,200 43,199 69,000

74,447 177,200 14,800 69,000

Inspectors - County Project Management Capital - IIT Hardware

28,399

Total Cost:

12,190,114 1,141,267

11,048,847

Funding Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

Trans from General Fund General Obligation Bonds

353,012

27,650

325,362

11,837,102 1,113,617 12,190,114 1,141,267

10,723,485 11,048,847

Total Cost:

21

Capital Project Summary

Capital Project Number: GG1034

Activity #: C1053.1053.01

Capital Project Title: Renovation of Westview Fire Station #31

Region: Frederick

Asset Type: Public Safety Asset Category: General Government

Year Identified: 2021 Est Completion Date: 12/31/2025

Capital Project Status: Active

Capital Project Description: The Westview Fire Station, #31 originally built in 2001, has outgrown its intended purposes. Additional staffing and services have been added over the years causing the current facilities to be out-grown based on its current configuration. This CIP Request is to hire a design team to take the current footprint of the building (living area 5,000 sf) and reconfigure the layout to be more efficient based on staffing needs. This would include removal of all existing interior walls and redesign the current living area of the fire station to include kitchen, bunkrooms, office space, bathroom/locker rooms, dayroom, storage, etc. Because of land constraints, the footprint of the building cannot be increased.Also included in this project is expense related to continuity of operations, as the services this fire station provides will need to continue on a 24/7 basis. Temporary facilities will need to be included during the construction phase.

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

NonCapital Furniture / Equipment Architect/Engineering

96,100

96,100

418,377 368,377

50,000

Construction

1,532,500

1,532,500

Construction - IIT Infrastruct

18,300 153,700 56,513 45,100

18,300 153,700 28,800 45,100

Inspectors - County Project Management Capital - IIT Hardware

27,713

Total Cost:

2,320,590 396,090 1,924,500

Funding Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

Trans from General Fund General Obligation Bonds

271,580

71,580 200,000

2,049,010 324,510 1,724,500 2,320,590 396,090 1,924,500

Total Cost:

22

Capital Project Summary

Capital Project Number: GG1035

Activity #:

Capital Project Title: Jefferson Tech Fire Station

Region: Frederick

Asset Type: Public Safety Asset Category: General Government

Year Identified: 2021 Est Completion Date: 12/31/2030

Capital Project Status: Active

Capital Project Description: This new fire station will be built in accordance with the Division of Fire Rescue's program for the construction of a Sub Station sized fire station. The site for this fire station is located in the Jefferson Tech development, and is located on Fair Oaks Drive off Rt. 180 Jefferson Pike. The Jefferson Tech Fire Station will be similar to the program used for the Green Valley Fire Station replacement with a net of circulation square footage of 14,825 or 17,140 gross square footage. This fire station will consist of 4 pull-through apparatus bays and operational/living area. Approximately 3.0 acres of land is in the process of being deeded to the County by the developers of this sub-division.

Cash Requirement Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

NonCapital Furniture / Equipment

235,700

235,700

Site Improvement - NonBldg

192,100

192,100

Architect/Engineering

1,165,000 9,825,100

1,165,000

Construction

9,825,100

Construction - IIT Infrastruct

82,401 166,500

82,401 166,500

Inspectors - County Project Management Capital - IIT Hardware Fire/Rescue Apparatus

6,400

3,200

3,200

69,000

69,000

1,613,000 13,355,201

1,613,000 2,973,300

Total Cost:

10,381,901

Funding Schedule:

Project Total

Prior Budget

Categories

2025

2026

2027

2028

2029

2030 Costs After

Trans from General Fund General Obligation Bonds

250,000

250,000

13,105,201 13,355,201

2,723,300 2,973,300

10,381,901 10,381,901

Total Cost:

23

Made with FlippingBook Learn more on our blog