Like most County departments, the Highway Department has seen a dramatic increase in the level of need for its services over the past decade. Most of the increases are due to a significant amount of growth in a relatively short period of time. The increased growth has caused an acceleration of the wear and breakdown of these roads. With normal use, a paved surface should last between 10-20 years. Currently, the County is responsible for the maintenance of approximately 1,301 centerline miles of roads.
x Pavement Management Program - This program funds Roadway Surface Management System, Surface Coat, Patching, Overlay, Cold-in-Place Recycling, and Full-Depth Reclamation. This project is scheduled for funding throughout the six-year CIP ranging from $13.7 – $23.2 million per year for a total of $108.1 million x Highway Network Systemic – General Consists of the road stabilization, pipe culvert replacement, and the safety/spot improvements programs x Sidewalk Retrofit Program – A multi-year project to upgrade existing county owned pedestrian facilities to comply with current ADA standards x Pedestrian and Bicycle Missing Links – The focus of the program is to construct new sidewalk or bicycle segments where gaps or missing links occur between existing pedestrian and bicycle facilities Foxville Deerfield Rd Bridge Joint Replacement & Repairs Project
x Traffic Control and Safety – This program provides funds for signal needs and other traffic control treatments. On-going funding for the six years of the CIP is $1 million. x Cloverhill Stormdrain Improvements – This project will address the stormdrain culverts and associated drainage in the Cloverhill Development x Drainage Assessment Response Team – This program will help to improve the management and resolution of drainage issues in the County
x Thurmont & Johnsville Satellite Facility Improvements – This project will update the Thurmont and Johnsville road satellite facilities x Frederick Satellite Yard –This project will add an additional highway operations facility in the northern part of the County x Intercoastal Drive Brine System – This project will convert a decommissioned waste water treatment plant for use as a brine production facility serving parts of three different Highway Districts Mountville Road Slope Project
169
Made with FlippingBook - professional solution for displaying marketing and sales documents online