x Reich’s Ford Road - This project will primarily focus on the existing two lane road from Bartonsville Road to Ijamsville Road to meet the County standards for a collector or modified collector road per the current comprehensive plan and to upgrade/replace two bridges over Bush Creek. Design funding is scheduled in FY27 x Yeagertown Road – The project will upgrade the existing tar and chip surface and serve future traffic growth. Construction funding is scheduled in FY29 x White Rock Subdivision Improvements – This project proposes pavement rehabilitation, sidewalk reconstruction to ADA standards, drainage improvements, and curb and gutter replacement. Construction funding is scheduled in FY25

x Gas House Pike – This project will upgrade Gas House Pike from the Frederick City Limit to Boyers Mill Road to serve future traffic growth in the New Market region. Construction funding is scheduled in FY24 x Braddock Heights Improvements – This project will include improvements to several streets within the Braddock Heights community. Construction funding is scheduled in FY25 x Artie Kemp Road – This project will improve a section of the road to include pavement reconstruction, realignment, slope stabilization, drainage and installation of a retaining wall and guardrail. Construction is scheduled in FY26 x Michaels Mill Road – This project will provide rehabilitation of an existing section to include road widening, drainage and installation of a retaining wall and guardrail. Construction is scheduled in FY26

Monrovia E-W Connector project

Gas House Pike

x Old National Pike Corridor – This project will improve the roadway from Bartholows Road east to the Mount Airy town limits. The project includes construction of on-street bike lanes, geometric improvements, drainage improvements and other safety upgrades. A study is scheduled in FY28, with design scheduled in FY29 x Ballenger Creek Pike Corridor – This project will improve the roadway section from Elmer Derr Road south to MD 28 in Point of Rocks. The project includes construction of on-street bike lanes, geometric improvements, drainage improvements and other safety upgrades. Design is scheduled in FY28, with construction scheduled in the out years x New Design Road Corridor – This project will improve the roadway section from Harshman Way south to MD 28. The project includes construction of on-street bike lanes, geometric improvements, drainage improvements and other safety upgrades. A study is scheduled for FY27, with design scheduled in FY29 x Improvements to Urbana Pike – This project is for improvements to Urbana Pike between Sprigg Street and Urbana Church Road (South). The project includes sidewalk installation, drainage improvements, pavement reconstruction, parking improvements and traffic calming. A study is scheduled for FY27, with design in FY29 x Bethel Road Improvements – This project will improve a 1,700-foot section of Bethel Road to include installation of closed storm drain and associated road modifications with the removal of deep ditches along the way. A study is scheduled for FY28, with design in FY29 x Mountville Road Streetscape – This project is for improvements to Mountville Road between Cherry Lane and Adamstown Common Drive. The project will include sidewalk installation and/or improvements, drainage improvements and utility relocation to bring this section of road up to local street standards. Design is scheduled for FY24, with construction in FY26.

129

Made with FlippingBook - professional solution for displaying marketing and sales documents online