FY2021 Adopted Budget
Capital Project Summary
Capital Project Number: BR1029
Activity #: C6007.6007.01
Capital Project Title: Gas House Pike Bridge
Region: New Market
Asset Type: Bridges Asset Category: Bridges
Year Identified: 2010 Est Completion Date: 12/1/2021
Capital Project Status: In Progress
Capital Project Description: This project includes the construction of two separate two-lane bridges (75 and 50 foot spans) carrying Gas House Pike over Linganore Creek. The proposed bridges replace an existing bridge (larger multi-cell pipe structure) and a small structure (small multi-cell pipe structure) that are prone to flooding. The roadway profile will also be raised significantly to reduce the flooding frequency at this location. The roadway approaches within the project limits will be designed to meet collector standards. This road is designated as an on-street bikeway. The 2015 ADT at the bridge is 1,417 vehicles per day.
Cash Requirement Schedule:
Project Total
Prior Budget
Categories
2021
2022
2023
2024
2025
2026 Costs After
Land
145,000 145,000 478,300 478,300 717,500 692,500
Site Improvement - NonBldg
Architect/Engineering
25,000
Construction
4,023,600 3,523,600 500,000 575,800 375,800 200,000 5,940,200 5,215,200 725,000
Inspectors - County
Total Cost:
Funding Schedule:
Project Total
Prior Budget
Categories
2021
2022
2023
2024
2025
2026 Costs After
Federal Grants - Capital Trans from General Fund General Obligation Bonds
3,476,300 2,996,300 480,000 445,000 200,000 245,000
2,018,900 2,018,900
Total Cost:
5,940,200 5,215,200 725,000