FY2021 Adopted Budget
Capital Project Summary
Capital Project Number: PR1028
Activity #: C7105.7105.01
Capital Project Title: Middletown CP Development & Rehab
Region: Middletown
Capital Project Status: In Progress Asset Type: Parks & Recreation Asset Category: Parks & Recreation
Year Identified: 2013 Est Completion Date: 12/1/2021
Capital Project Description: This project includes both an expansion to the existing Community Park and a rehabilitation of current facilities, where appropriate. The expansion portion of the project is requested to emphasize development in the eastern section of the Park. Construction may include the development of a soccer/football field, little league field, parking lot, playground, restroom, and pond dredging with bank erosion protection. Construction of a restroom near the pond and installation of athletic field lighting for two (2) softball and two (2) little league fields and replacement of existing perimeter guardrail may also be accomplished. The rehabilitation portion of the project is intended to make improvements to park components that have reached the end of their life cycle. Park amenities and facilities projected to be included in this portion of this project may include, where appropriate, replacement of both entrance signs; repair/resurfacing of road/walkway paving; install paved sidewalk over dam; replace bleacher pad pavement with concrete; pave maintenance yard and enlarge overflow parking lot; replace shop and concession roofing; replace shelter electrical systems; improvements to pond; replace aerator system; replace truck shed and wood shop; install bulk storage bins; replace maintenance yard fence, replace all backstops/overthrow and outfield fences, replace fountains, valve vault and valves and water piping as needed, rehab restroom interior and replace street lights where needed, install lights along maintenance road and recycling area, and install security lighting/camera system in shop yard. Project will also include updating/amending the current Park Master Plan to include a skate spot, which was approved by the BOCC on September 15, 2009. Some miscellaneous park equipment may also be replaced, as appropriate.
Cash Requirement Schedule:
Project Total
Prior Budget
Categories
2021
2022
2023
2024
2025
2026 Costs After
NonCapital Furniture/Equipment
24,864
24,864
Site Improvement - NonBldg
206,418 206,418 498,747 498,747
Architect/Engineering
Construction
7,500,000
7,500,000
Construction - IIT Infrastruct
71,685 257,911 69,539 138,230 26,406
71,685
Inspectors - County Project Management
55,535 202,376
32,760
36,779 138,230 26,406
Capital - Furniture / Equipmen
Capital - IIT Hardware
Total Cost:
8,793,800 793,460 8,000,340
Funding Schedule:
Project Total
Prior Budget
Categories
2021
2022
2023
2024
2025
2026 Costs After
Trans from General Fund Trans from Parks Acquisition General Obligation Bonds
0
6,593,800 793,460 5,800,340
0
Recordation Tax Bonds
2,200,000
2,200,000
Total Cost:
8,793,800 793,460 8,000,340